22/6433Granted
Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach/ Slievereagh, Baile Bhuirne/Ballyvourney, Maigh Chromatha, Macroom, Co. Chorcaí/Co. Cork
Athraithe a dhéanamh ar an fhorbairt ceadaithe cheana faoi thagairt phleanála 19/5869 don chéad phas d’athfhorbairt phasach agus athrú úsáide de iarr Choláiste Íosagáin, anois in anchaoi, ag An Sliabh Riabhach, Baile Bhuirne, Maigh Chromtha, Co. Chorcaí. Tá na leasaithe seo leanas á moladh ar an fhorbairt a ceadaíodh roimhe seo: (i) Páirt-scartáil de fhoirgneamh iar Choláiste Íosagáin (an chuid aon stór ar chúl an iarr fhoirgneamh scoile), (ii) Mionathraithe ar na leaganacha amach den fhoirgneamh atá ann cheana ceadaithe faoi thagairt pleanála 19/5869, (iii) Síneadh nua 3 stór a thogáil, ina mbeidh san áireamh forsheomra iontrála, ardaitheoir, staighre, leithris, pasáistí agus seomraí innealra ar chúl an phríomh fhoirgneamh atá ann cheana le húsáid mar spásanna coimhdeacha leis an úsáid oifige ceadaithe faoi thagairt pleanála 19/5869, (iv) Tógail 2 umar stórála uisce comhraicthe dóiteáin os cionn talún, (v) Tógail carrchlóis, draenáil, tírdhreachtú, comharthaíocht agus no hoibreacha suímh ar fad bainteach leo. Permission for amendments to development permitted under Ref No. 19/5869 for the 1st phase of a phased redevelopment and change of use of the former Coláiste Íosagáin Building which is now in disrepair in Sliabh Riabhach. The following are the proposed amendments to the previously approved development: 1.Partial Demolition of former Coláiste Iosagáin existing building (single storey structure to rear of former school building) 2.Minor alterations to the layout of the building previously permitted under 19/5869. 3. Construction of new three-storey extension which will include entrance lobby, lifts, stairs, bathrooms, passages, and machinery room to the rear of the existing main building for use as spaces ancillary to the office use permitted under 19/5869. 4. Construction of 2 no. above-ground fire-fighting water storage tanks 5. Construction of car parks, drainage, landscaping, signage, and all associated site works.Decision record indexedDecision05 April 2023View record