Permission for refurbishment of a derelict house, including the addition of windows, a door opening and a larger rooflight to the northern elevation, raising of the roof, demolition of the existing ruins attached to the western elevation of the house, construction of a single storey extension onto the western elevation, new entrance, new wastewater treatment system together with all ancillary site works.Decision record indexed
Construction of dwelling house and domestic garage, new entrance, wastewater treatment system together with all other ancillary site works. A Natura Impact Statement will be submitted to the Planning Authority with the application.Decision record indexed
The townlands of Slievereagh And Coomnaclohy Ballyvourney Co Cork
The development will consist of the provision of the following: (i) Underground electrical cabling (33kV); (ii) Access roads (new and upgrade of existing); (iii) Amendments to the permitted developments (Ref. No. 19/4972), including extension to the borrow pit and the omission of the 38kV electrical substation, 38kV underground cabling and battery storage compound; (iv) Site drainage; and (v) All associated site development ancillary works and apparatus. The development subject to this application forms part of grid connection and access arrangements which will facilitate the permitted Knocknamork Renewable Energy Development, Cork County Council Ref. No. 19/4972. Concurrent planning applications in relation to the overall grid connection and access arrangements will also be lodged to Kerry County Council and An Bord Pleanála. An operational period and extended planning permission duration to align with the permitted Knocknamork Renewable Energy Development, Cork County Council Ref. No. 19/4972 is sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompanies this application.Decision record indexed
Alterations to the dimensions of the 7 no. wind turbines permitted as part of the Knocknamork Renewable Energy development (planning reference 19/4972). The proposed development includes the provision of 7 no. wind turbines with an overall ground to blade tip height of 175m (an increase of 25m, from 150m), a rotor blade length of 75m and a hub height of 100m, and all associated site development and ancillary works, an operational period and planning permission duration to align with the existing permission (planning reference no. 19/4972 ) is sought. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this applicationDecision record indexed
Demolish part of the existing dwelling, complete alterations to the elevations of the existing dwelling and construction of new extensions to the northeast and southeast of the existing dwelling together with the construction of a new detached garage, new potable well, an effluent treatment system, modifications to the existing vehicular entrance and all associated site worksDecision record indexed
The construction of a detached dwelling, detached garage, new potable well, an effluent treatment system, new vehicular entrance and all associated site works.Decision record indexed
The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field.Decision record indexed
Iar Choláiste Íosagáin, atá anois folamh ag An Sliabh Riabhach / Slievereagh Baile Bhuirne Maigh Chromtha, Co. Chorcaí
An chéad phas de fhorbait céimnithe, ina mbeidh, (i) athrú úsáide go húsáid oifige do chuid den fhoirgneamh atá ann cheana (ii) athrú úsáide go húsáid halla taispeántais do chuid den mbunurlár (iii) páirteanna den tógáil aon stór ag cúl an fhoirgnimh agus seomraí coire 3 stór agus na botháin stórais coimhdeacha a leagadh (iv) struchtúr do ardaitheoir trí stór agus staighrí a thógáil ag cúl phríomh fhoirgneamh atá ann cheana (v) athchóiriú agus athruithe a dhéanamh ar an chuid lárnach den fhoirgneamh atá ann cheana (vi) athruithe a dhéanamh ar fhallaí teorainn, iotráil suímhe agus geataí atá ann cheana, láithreacha nua páirceála, oibreacha draenála, tírdhreachtú, comharthaíocht agus oibreacha suímhe gaolmhara. /The first phase of a phased development consisting of (i) Change of use of existing building to office use, (ii) Change of use of part of ground floor to use as exhibition hall, (iii) Demolition of part of a single storey construction to the rear of the building, 3-storey boiler rooms and ancillary storage sheds, (iv) Construction of a 3-storey elevator structure and stairs to the rear of the main existing building, (v) Renovation and changes to the central part of the existing building, (vi) Changes to the existing boundary walls, site entrance and gates, new parking spaces, drainage works, landscaping, signage and associated site works. At the former Colaiste Íosagáin, empty now, Slievereagh, Ballyvourney, Macroom, Co.CorkDecision record indexed