Planning records
Showing 1-16 of 16 public recordsInstallation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Retention for ground floor rear Extension and permission for extension to first floor at rear and all ancillary site works
1) The provision of a pedestrian/cyclist entrance on the northern boundary including turnstile and disabled access gates, and stepped and ramp accesses to the footpath; and 2) The provision of a stepped pedestrian access to the existing monitoring station building at the north west boundary including repositioning of boundary fence to incorporate the area into the overall campus.
Demolition and removal of the existing entrance canopy at first floor level and the construction of a new entrance canopy over extended units. Replacement of existing Liffey Valley signage on the northern elevation with a new sign of 3.Sm x 8.35m. Upgrading of the existing northern elevation facade to a render finish. New tinted transparent window vinyl to be applied internally to the existing drum's glazing; Extension of the existing Units 20 and 21 into the existing plaza to facilitate increased units of 240sq.m and 380sq.m; Extension of Unit 19 to provide for relocation of ATM and ancillary back of house area (6.7sq.m) on the eastern elevation of the extended Unit 20; The total additional floorspace is 394.7sq.m; Unit 20 is proposed as a retail unit and Unit 21 is proposed as a food/beverage unit; Facade signage is proposed on the northern elevation of both units (0.625m x 5.09m) and on the eastern elevation of Unit 20 and western elevation of Unit 21 (both 0.665m x 2.16m) (total unit facade signage of 9.24sq.m); Relocation of existing 6 accessible car parking spaces, currently located to the north of the entrance/plaza, to within the existing car park and landscaping of proposed site in line with recently upgraded landscaping in the centre; The placement of 2 car-parking pay station units with canopy to the east and west of the site adjacent to the existing Centre facade; All Associated Site Development Works.
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
A new unmanned service station development consisting of construction of new petrol filling station forecourt with 4 dispensers, 2 underground fuel storage tanks with canopy structure (covering c. 235sq.m and 6.2m in height) with associated signage; Widen existing site entrance to the north-east of the site and creation of new egress location onto the Fonthill Road along the northern boundary to allow one-way internal road network incorporating new pedestrian crossing over existing footpath at site egress location; Automatic brush car wash and adjoining jet car wash with water recycling system; Single storey services building structure comprising of a car wash plant room and comms room area (gross floor area 16.3sq.m.); 4 electric charging bays, each comprising of a parking space and electric vehicle charging unit and associated signage; 3-room ESB substation to cater for EV charging infrastructure (gross floor area 38.3sq.m.); Air/Water services area with 2 car parking spaces; 2 internally illuminated double-sided totem signs, 1 at site entrance (4m high x 1.91m wide) with advertising area 15.3sq.m and 1 adjacent the new site egress location (5.8m high x 1.91m wide) with advertising area 22.16sq.m; All other associated underground and overground infrastructure, drainage, lighting, CCTV unmanned systems, landscaping and site development works.
Construction of 2 two and a half storey, three-bedroom terrace houses and associated site works attached to the existing two and a half storey house at No. 6 Station Grove which was constructed in 2006; the 2 houses will complete this partially finished housing development which was originally granted permission under planning reference SD05A/0125.
Construction of a 242 bedroom hotel in a building ranging in height from 7 to 10 storeys over ground and lower ground floor levels; the development will include the lower ground floor accommodating 202 car parking spaces; 54 bicycle parking spaces, plant, stores and ESB substation; ground floor accommodating hotel entrance and reception area; restaurant and bar; outdoor terrace and patio with canopies; function room; meeting rooms; kitchen, staff facilities; stores, toilets and plant; ground floor mezzanine accommodating meeting rooms; admin office; store and laundry facilities; 1st to 9th floor accommodating 242 hotel bedrooms including 17 suites; 10th floor accommodating gym/yoga studio; plant, storage and a roof terrace; vehicular access from both the N7 slip road and Knockmeenagh lane with link street across the site; upgrade works to Knockmeenagh lane; landscaping; boundary treatment; wastewater pumping station; associated signage and all site development works and services; the site is located between Knockmeenagh Lane to the north, St. Brigids cottages to the east, the Nass Road (N7) to the south and the Nass Road Business Park to the west.
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
Provision of 4 new information and communications technology (ICT) Facility buildings and associated development at the subject site, superseding elements of the extant planning permissions on site (Reg. Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185). The application site is subject to an EPA Industrial Emissions Licence (Ref. No,: P1113-01) relating to the Energy Centre permitted on site, The single storey Energy Centre, gas pressure reduction station, and 110kV Gas Insulated Switchgear (GIS) substation permitted under Reg, Ref.: SD18AI0068 and Reg. Ref.: SD19AI0185 will be constructed as previously approved and are not affected by the current application. The proposed development will comprise the following: The construction of 4 ICT Facility buildings (ICT Facilities 1, 2, 3, and 4) with a combined total gross floor area {GFA) of c. 47,564.5 sq.m, Each ICT Facility building includes associated external plant areas, totalling c, 20,649.5 sq,m, ICT Facilities 1, 2, and 3 will be located in the eastern portion of the site, and each comprise a GFA of c. 15,196 sq.m (including ancillary office and administration space) over part two and part three levels with a maximum height of c, 25 metres and a parapet height of c, 19.5 metres, Each of the ICT Facilities will include an associated external plant area of c, 6,624 sq,m, ICT Facility 4 will be located in the southern portion of the site and comprises a GFA of c, 1,976.5 sq,m (including ancillary office and administration space) over two levels with a maximum height of c, 15 metres and a parapet height of c. 10.5 metres, This ICT Facility includes an associated external plant area of c. 777.5sq.m, Each ICT Facility building will accommodate ICT equipment halls, associated electrical and mechanical plant rooms, loading bays, maintenance and storage space, office administration areas, and screened plant. Construction of internal road network and circulation areas, footpaths, provision of 153 no. car parking spaces and 54 no, cycle parking spaces. Connections to vehicular access routes, roads, services and permitted infrastructure relating to the Energy Centre and 110kV GIS substation permitted under Reg, Ref.: SD18A/0068 and Reg, Ref.: SD19A/0185. Provision of emergency generators with associated flues, water storage tanks and associated pump rooms (comprising 150 sq,m in total) to serve each of the proposed ICT Facility Buildings. Hard and soft landscaping and planting, lighting, and all associated works, including underground foul and storm water drainage network, boundary treatments and security fencing, attenuation areas, and utility cables.
Two storey extension to the rear of existing dwelling, to include rooflights and all ancillary site works.
Alterations to previously approved, but not yet constructed development under planning Ref. Ref. (SD11A/0135 - Block A was approved as a primary health care building and will remain so; Block B was approved as a nursing home building and permission is now sought to use that building as a primary health care us; Permission is also sought for an external café and relocation of sub-station from entrance area to a position on Fonthill Road); alterations to Block A of 3,249sq.m consist of minor internal reconfiguration to stair No. 1 cores, position of lift shafts and circulation areas; alterations to Block B of 3,521sq.m (previously approved use as a nursing home) to facilitate the use as a primary healthcare centre include internal reconfiguration to provide 10 consultation rooms; 37 offices; 7 clinic rooms; 4 administration/reception; 4 large group rooms and associated ancillary uses including a new external lift and stair to car park; a total of 149 car parking spaces are to be provided for the proposed development; this includes 125 spaces at basement level including 6 accessible car parking spaces and 24 spaces at surface level including 3 accessible car parking spaces; alterations to the previously approved permission also include for 20 new bicycle parking spaces; new plant space and storage; the previously approved entrance from Boot Road/Convent Road providing pedestrian, cycle and vehicular access including previously approved landscaping, remain as approved.
Installation of an above ground water retention tank (13.1m x 8.1m x 2.85m high); underground water retention tank (8.3m x 3.70m x 5m deep) and balancing system, located at the south-east corner of the site including the diversion of surface water drains to the existing foul sewer system via the proposed tank and all site works associated with the proposed development.
Two storey extension to the rear of existing dwelling to include roof lights and all ancillary site works.
Demolition of the existing dwelling known as 'San Guida' (225sq.m), ancillary garage (25sq.m), outbuilding (31sq.m) and garden walls; construction of a part 3 to part 4 storey apartment development (1,837sq.m) comprising 21 units (6 one bedroom and 15 two bedroom apartments) all with associated balconies/terraces; widening of the existing vehicular entrance along 'New Road'; 21 car parking spaces; bicycle parking; bin store, boundary treatments; hard and soft landscaping; plant; green roof; sub-station; lighting; solar photovoltaic panels and all other associated site works above and below ground.