GrantedDecided 16 March 2020Carlow County Council

2016: For the demolition of existing rear extension and for the construction of a rear extension, proprietary effluent waste water treatment system, polishing filter and ancillary services associated with same

Bohermore, Co. Carlow
DecisionConditional grant
Decided16 March 2020
Application typePERMISSION
Source documents5

Site

What is on file

0refusal reasons15conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development to be carried out in accordance with plans received 24/01/2020.Other
  • 2Permission limited to development detailed in application.Other
  • 3External finishes per Drawing 001 H; smooth plaster neutral colour; slate roof to match existing. No white uPVC for windows or rainwater goods.Design Materials
  • 4All existing mature trees and hedgerows on/bounding site to be retained and maintained in situ.Environment Ecology
  • 5Lines of sight at road entrances per DMRB. Road opening licence required for any public road works.Traffic Access
  • 6No surface water discharge to public road or adjoining properties. All surface water to soakways/system per BS 8301:1985 and BRE Digest 365.Wastewater Drainage
  • 7On-site wastewater system per EPA COP 2009. Polishing filter located NW corner for separation from three downstream wells. Effluent filter required. Certificate of Compliance and 'as-constructed' drawings prior to occupation. No surface water infiltration. Grease trap installed. Septic tank tested per IS EN 12566/SR 66.Wastewater Drainage
  • 8Strict separation: only clean surface water to soakpits; only foul/soiled water to treatment system.Wastewater Drainage
  • 9If connecting to Irish Water network, connection agreement required prior to commencement. Comply with CDS Technical Documentation.Water Services
  • 10All removed material disposed at licensed facilities by licensed operators.Construction Management
  • 11Construction traffic: off-carriageway parking only, no road parking, keep road clean, litter-free site, control noise/dust.Construction Management
  • 12Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays/Bank Holidays.Construction Management