Conditional grantDecided 08 February 2021Carlow County Council

20444: Permission sought for the demolition of existing rear extension and for the construction of a rear extension, proprietary effluent waste water treatment system, polishing filter and ancillary services associated with same

Bohermore, Co. Carlow
DecisionConditional grant
Decided08 February 2021
Application typePERMISSION
Source documents3

Site

What is on file

0refusal reasons10conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received on 08/12/2020.Compliance
  • 2Permission is strictly limited to the submitted application and does not cover any other development on the site.Compliance
  • 3External finishes, windows, doors, and rainwater goods must match submitted drawings. Smooth render finish must be neutral colour and texture.Design Materials
  • 4Do not impair existing drainage. All surface water must be collected and disposed of to soakways/system per BS 8301:1985 and BRE Digest 365. No discharge to public road or adjoining properties.Wastewater Drainage
  • 5On-site wastewater system must comply with EPA Code of Practice 2009. Requires as-constructed drawings, stilling chamber, max 5 distribution pipes per box, liquid levelling devices, activated carbon vent filters, effluent filters, and decommissioning of existing septic tank. Polishing filter relocated to NW corner to maximise separation from existing wells.Wastewater Drainage
  • 6Applicants must sign an Irish Water connection agreement, comply with CDS Technical Documentation, and adhere to Irish Water Capital Investment Programme constraints.Water Services
  • 7Provide off-carriageway parking for construction traffic. Prevent debris/muck on public roads. Maintain neat site. Control noise and dust emissions to protect neighbouring amenities.Construction Management
  • 8Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00. No work on Sundays or Bank Holidays.Construction Management
  • 9Consult Chief Fire Officer and strictly comply with all fire safety requirements prior to commencement.Compliance
  • 10Pay development contribution of €660.88 prior to commencement, plus interest at 5% p.a. from grant date.Development Contribution

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.