Conditional grantDecided 19 March 2020Carlow County Council

2019: For the construction of a walled silage pit, concrete aprons with all associated site development works. Please note that this proposed development is within the curtilage of a protected structure

Dunleckney, Muinebheag, Co. Carlow
DecisionConditional grant
Decided19 March 2020
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons14conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason

No refusal reason is on record for this application yet.

Conditions

  • , Development to be carried out in accordance with plans received 27/01/20.Compliance
  • , Permission limited to development as detailed in submitted plans.Compliance
  • , External concrete walls to have a neutral coloured finish.Design Materials
  • , Retain existing mature trees and hedgerows; new planting per Drawing J666-PL03-001 in first planting season post-completion.Landscaping Boundary
  • , Lines of sight at entrance per DMRB; road opening works require Road Opening Licence and Planning Authority agreement.Traffic Access
  • , Design and construction to comply with SI605/2017 and Dept of Agriculture 'Minimum specification for concrete walled silos S120'.Compliance
  • , Implement construction control measures per Screening for Appropriate Assessment; prevent spread of Alien Invasive species; slurry management per SI605/2017.Environment Ecology
  • , Do not impair existing drainage; surface water to soakways/system per BS 8301:1985 and BRE Digest 365; no discharge to public road.Wastewater Drainage
  • , Only clean surface water to soakpits/system; foul/soiled water to wastewater treatment system.Wastewater Drainage
  • , Sign Irish Water connection agreement prior to commencement; comply with CDS Technical Documentation.Water Services
  • , Provide off-carriageway parking for construction traffic; prevent debris on public road; control noise and dust.Construction Management
  • , Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00; no work on Sundays or Bank Holidays.Construction Management

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.