20291: For a single storey / part storey & half dwelling, septic tank and percolation area, new vehicular entrance, bored well and all associated site works
Ardbearn, Rathoe, Co. Carlow
DecisionConditional grant
Decided30 November 2020
Application typePERMISSION
Source documents4
Site
What is on file
0refusal reasons17conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
- , Development to be carried out in accordance with plans received 19/08/20 and amended by FI response 04/11/20.Compliance
- , Permission authorises only the development detailed in the application.Compliance
- , Dwelling must be first occupied as permanent residence of applicant and immediate family for 5 years. Section 47 Agreement required prior to commencement.Occupancy
- , Section 47 Agreement to preserve adjoining agricultural land from further residential development.Occupancy
- , External finishes per elevation drawings. Plastered walls neutral. Roof blue/black or slate grey. No white uPVC for windows/doors/rainwater goods.Design Materials
- , Boundary planting retained/maintained per Landscape Plan. Indigenous species. Roadside planting minimum 4-5 years growth.Landscaping Boundary
- , Lines of sight at road entrances per DMRB. Road opening licence required prior to commencement.Traffic Access
- , Height of site entrance wing walls, piers and boundary walls not to exceed 1.2 metres.Traffic Access
- , Development not to impair existing drainage. Surface water to soakaways per BS 8301:1985 and BRE Digest 365. Aco Drain on roadside boundary.Wastewater Drainage
- , On-site wastewater system per EPA Code of Practice 2009. Certificate of compliance required prior to occupation. Vents, distribution pipes, carbon filters, effluent filters, grease trap, no surface water infiltration.Wastewater Drainage
- , Only clean surface water to soakpits. Foul/soiled water to wastewater system.Wastewater Drainage
- , Connection to public water/wastewater network requires agreement with Irish Water prior to commencement. Comply with CDS Technical Documentation.Water Services
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / Fc3b67c7-88cb-4b9f-a573-51bc13b3c211.pdf / Document 109269Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / B9604f6c-8b0a-49a7-9d46-2ded2484b2ce.pdf / Document 109270Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 05181d8c-66e4-40f2-a448-69c7d935a7c6.pdf / Document 109264Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560220A 5-year permission for temporary development at Bendinstown (townland) in County Carlow. The development will consist of the installation of 3 no. single storey porta cabin units for use as office (2 no.) and storage space (1 no.), 6 no. car parking spaces and all associated site development works. The proposed development will serve the Garreenleen Solar Farm Development (as permitted under Carlow County Council Reference 20/143 / An Bord Pleanála Reference ABP-307891-20). The proposed operational development will be accessed via the L7112 local road via the entrance permitted under An Bord Pleanála Reference ABP-313139-22 / 0.5 km away / 23 September 2025Conditional grant
- 22199To apply for a 10 year permission for the proposed development of an underground electricity interconnector cable. The proposed development of the underground electricity interconnector cable will comprise 1 no. 33kV triple circuit cable of c.92 metres in length which is to be installed in an excavated trench including underground ducting and all associated site development and reinstatement works. The proposed development represents a minor revision to the approved layout of the solar farm previously permitted under Carlow County Council planning reference 20/143 and An Bord Pleanala Reference 307891-20 comprising the laying of underground cabling in the previously permitted grassed field area. The purpose of the proposed development is to facilitate the interconnection from the permitted solar farm to a 110kV substation which is the subject to the application to An Bord Pleanala (Reference VA01.313139) A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.5 km away / 09 August 2022Conditional grant
- 22418The construction of a new two storey dwelling house, connected 'Granny flat', double garage, septic tank with percolation area, the reconstruction of existing site entrance and all associated ancillary works / 0.6 km away / 05 July 2023Conditional grant
- 2660042An agricultural entrance & all associated works for access to existing farmyard / 0.7 km away / 12 May 2026Conditional grant
- 2460214To 1) reinstate & refurbish existing traditional cottage / dwelling with altered floor plan and minor changes to external facades 2) extend the main cottage / dwelling pitched roof over the existing garage on the side elevation & convert garage to living accommodation and 3) install new on site effluent disposal system and all associated site works / 0.9 km away / 18 September 2024Conditional grant
- 17219Permission for the construction of a storey and a half type dwelling, domestic garage, septic tank and raised percolation area, bored well, new entrances and all associated site works / 1.1 km away / 11 December 2017Conditional grant
- 1728Permission for retention for an existing single storey garage, planning permission to extend the same with minor alterations to the external façade and alterations to the front porch area to include relocation of front door, additional glazing and all associated site works / 1.3 km away / 30 March 2017Conditional grant
- 1932Single storey dwelling, domestic garage, septic tank and raised percolation area, new vehicular entrance and all associated site works / 1.4 km away / 23 May 2019Conditional grant