Leighlinbridge, Co. Carlow
Planning application 22239
DecisionConditional grant
Decided07 September 2022
Application typePERMISSION
Source documents3
Site
What is on file
0refusal reasons14conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development must be carried out in accordance with plans received 15/07/2022.Compliance
- 2External wall, roof finishes, and windows for the extension must match the existing school.Design Materials
- 3Permission relates only to the submitted application and does not cover other development on site.Compliance
- 4Access must be provided for the disabled, including wheelchair users, per Building Regulations and NDA/NRB guidelines.Traffic Access
- 5Do not impair existing drainage; surface water must be collected and disposed of to soakways or site system per BRE Digest 365.Wastewater Drainage
- 6Only clean surface water to be diverted to surface water systems; no dispersion onto public roadway; new connections require agreement.Wastewater Drainage
- 7Sign Irish Water connection agreement prior to commencement; comply with CDS Technical Documentation; subject to Capital Investment Programme.Water Services
- 8Provide off-carriageway parking for construction traffic; keep public road clear of muck/debris; dispose of waste at authorised facilities; maintain site neat; control noise/dust; obtain road opening license for any road/footpath openings.Construction Management
- 9Submit Construction Management/Traffic Management Plan for written agreement prior to commencement, covering traffic management, routes, parking, compound, deliveries, and signage.Construction Management
- 10Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00; no work on Sundays or Bank Holidays.Construction Management
- 11Erect appropriate warning signage during construction for road users and the public.Construction Management
- 12Relocate existing services/utilities as required; all service lines and cables must be located underground unless otherwise agreed.Compliance
Planning a project near Leighlinbridge, Co. Carlow?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 592a7e95-beba-464e-af0c-049b089b3430.pdf / Document 107719Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 58ced965-1428-415e-b719-4a012648fe94.pdf / Document 107718Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 19191For the provision of a new temporary standalone prefabricated structure containing 2 no. classrooms with associated sanitary facilities and ancillary rooms to the side of the existing school building, together with all associated site works and services / 0.0 km away / 01 August 2019Granted
- 2360307The construction of a Two-Storey Dwelling with Loft bedroom, connection to services and all associated site development works / 0.2 km away / 05 September 2024Granted
- 2360082Planning permission is sought for the change of use and internal alterations of existing post office and retail space to provide a ground floor residential unit with all associated works / 0.3 km away / 31 August 2023Granted
- 2153Retention Permission is sought for existing entrance and access road to existing holiday homes and all associated ancillary site works / 0.3 km away / 16 April 2021Granted
- 2660045The change of usage from holiday home to permanent residential usage / 0.4 km away / 10 April 2026Granted
- 20455Permission for (a) to erect a rear single storey kitchen / dining room extension, (b) to erect a first floor side extension over existing single storey section of house (c) to carry out minor alterations to front elevation of existing house together with all associated site works at / 0.5 km away / 31 March 2021Granted
- 21510The construction of a single-storey dwelling with basement, connection to mains sewerage & water services, new splayed entrance, and all associated site development works / 0.5 km away / 02 June 2022Granted
- 22310The refurbishment of derelict dwelling, connection to mains foul sewer and all associated site development works / 0.5 km away / 21 June 2023Granted