22354: Development will consist of the construction of a housing development of 42 dwellings, consisting of 36 No. two storey semi-detached dwellings, 6 No. two storey terrace dwellings, new site entrance, internal site roads, connections to services, public open space, landscaping, boundaries, a small memorial park with seating to part of the roadside boundary and all associated siteworks
Fenagh, Co. Carlow
DecisionRefused
Decided09 December 2022
Application typePERMISSION
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason
No refusal reason is on record for this application yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / E0b99b1d-5dc8-443a-819e-72ccded42bea.pdf / Document 106505Source PDF
- Notification Of DecisionSource: carlowcoco.eplanning.ie / 8e5d7ad2-27a0-4daf-8bcd-8165852deed3.pdf / Document 106506Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 2260003Permission is sought for the construction of 2 no. semi-detached houses, connection to existing public foul sewer, stormwater sewer and watermain with all associated ancillary site works / 0.2 km away / 16 February 2023Refused
- 19105Retention of a timber building and the use of the building for the operation of the 'Hair and Beauty Chalet'. Planning permission is also sought for (i) a change of use of an existing agricultural shed, to a hair and beauty salon and academy (ii) a change of use of an existing agricultural entrance to a commercial entrance (iii) the installation of a wastewater treatment system and all ancillary site works / 1.7 km away / 10 May 2019Refused
- 21371Retention Planning Permission to retain existing advertising signs of 17.64msq, associated supporting structure and all ancillary site works / 1.7 km away / 24 November 2021Refused
- 2460346A single storey, three bedroom bungalow with a separate garage and a waste water treatment, plant bored well, new site entrance & all associated site works / 3.2 km away / 13 December 2024Refused
- 2360205The as-built entrance and commercial vehicle parking area and all associated works / 3.5 km away / 11 September 2024Refused
- 2360184Retention permission for the following, 1. The construction of a single storey extension to an existing domestic garage, 2. the unauthorised change of use of the afore mentioned domestic garage to use as a habitable dwelling, 3. the unauthorised installation of a septic tank & percolation area, 4. the construction of a domestic store and a boiler house, and all associated works / 3.5 km away / 11 October 2023Refused
- 2560301A temporary community training facility for a period of 5 years to include training pitches, parking facilities, new site entrance and exit system. Temporary portacabin type structures to provide, canteen, changing, w.c. facilities, referee and storage rooms. A self contained waste water treatment system, plus all associated site works and site enclosures to facilitate the development / 4.5 km away / 24 November 2025Refused
- 2560068A quarry development, at Coolnapish, Bagenalstown, Co. Carlow on behalf of Milford Quarries Ltd., comprising of: (a) The excavation of 114,000 m3 of sand and gravel (no processing), over an extractive area of 2.11-hectares at an average annual rate of circa 40,000 tonnes, over a 5-year period (i.e. circa 190,000 tonnes overall). (b) Construction of a new splayed entrance and access road. (c) Construction of a perimeter berm within a 5m-wide strip immediately adjacent to and outside the extractive area, all within the overall development area of 2.49-hectares. (d) Construction of a wheelbath. (e) All associated site works and services to facilitate the development. A five-year term is sought for extraction and an overall development period of eight years is sought to allow for preparatory site works and completion of restoration works. A Natura Impact Statement has been prepared in respect of the proposed development and is submitted with the Application / 4.6 km away / 24 April 2026Refused