GrantedDecided 19 April 2024Carlow County Council

Bagenalstown Industrial Park, Muine Bheag, Co.Carlow

Planning application 2360122
DecisionConditional grant
Decided19 April 2024
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons14conditions8nearby records

Proposed development

Application description published by Carlow County Council.
Planning permission is sought for the construction of an industrial storage unit with all associated site works, constructed to rear of existing industrial unit

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development carried out in accordance with plans received 27/06/2023, amended 21/12/2023, and clarification 23/02/2024.Compliance
  • 2NIS mitigation measures strictly adhered to; construction supervised by qualified environmental personnel/ecological clerk of works.Environment Ecology
  • 3Construction works comply with CIRIA C741, C532, and IFI Guidelines on Protection of Fisheries.Construction Management
  • 4External wall and roof finishes shall match existing industrial storage unit.Design Materials
  • 5Permission limited to proposed development; no further change/alteration/extension without permission.Compliance
  • 6Surface water contained on site; soakaways per BRE Digest 365; hydrocarbon interceptor installed; FFL 3.11m above predicted 0.1% AEP flood level (37.250m AOD).Wastewater Drainage
  • 7Only clean surface water discharged to soakaways/site system; foul waste to public foul sewer.Wastewater Drainage
  • 8No advertising signage or external lighting without prior written agreement.Design Materials
  • 9Sign Uisce Eireann connection agreement prior to commencement; comply with CDS Technical Documentation.Water Services
  • 10Construction traffic management: off-carriageway parking, road opening license for any road/footpath opening, clean vehicles, litter-free site, noise/dust control, invasive species management.Construction Management
  • 11Construction hours restricted to Mon-Fri 08:00-18:00 and Sat 08:00-13:00; no work on Sundays/Bank Holidays.Construction Management
  • 12All service lines/cables located underground unless agreed otherwise.Water Services

Planning a project near Bagenalstown Industrial Park, Muine Bheag, Co.Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →