Bagenalstown Industrial Park, Royal Oak Road, Muine Bheag
Planning application 2360154
DecisionConditional grant
Decided06 June 2024
Application typePERMISSION
Source documents6
Site
What is on file
0refusal reasons18conditions8nearby records
Proposed development
Application description published by Carlow County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development in accordance with approved plans received 31/07/2023, amended by FI 20/12/2023 and clarification 28/03/2024.Compliance
- 2NIS mitigation strictly adhered to. No construction within SAC at rear (southwest). Supervision by qualified ecological clerk of works. Qualifications submitted for written agreement prior to commencement.Environment Ecology
- 3Comprehensive CEMP submitted for written agreement prior to commencement. Covers construction programme, noise/dust/surface water management, emergency response, weekly meetings with Municipal District Engineer, public liaison.Construction Management
- 4External roof and wall cladding finish and colour shall match the existing industrial unit.Design Materials
- 5No advertising signage or external lighting attached to or erected on the site without prior written agreement.Design Materials
- 6Permission authorises only the development detailed in the approved plans. Does not relate to any other development on site.Compliance
- 7Existing trees and hedgerow on and bounding the site retained and maintained as currently in situ.Landscaping Boundary
- 8No impairment of existing drainage. No surface water to public road/adjoining properties. All surface water to soakways per BRE Digest 365 with inspection manholes. Hydrocarbon interceptor installed prior to discharge.Wastewater Drainage
- 9Site Specific FRA mitigation strictly adhered to. Finished floor level 690mm above predicted 0.1% AEP flood level (34.750m AOD).Environment Ecology
- 10Only clean, uncontaminated surface water to soakpits/surface water system. Only foul waste to public foul sewer.Wastewater Drainage
- 11Sign Uisce Éireann connection agreement prior to commencement. Comply with UE connection and CDS Technical Documentation. Connections subject to UE Capital Investment Programme constraints.Water Services
- 12No interference with public road without consultation/written agreement from Municipal District Engineer and Transportation Dept. Road Opening Licence per 2017 Guidelines submitted for written agreement prior to commencement.Traffic Access
Planning a project near Bagenalstown Industrial Park, Royal Oak Road, Muine Bheag?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
- Notification Of DecisionSource: carlowcoco.eplanning.ie / E8583388-4867-4098-ae7f-b114208d0e60.pdf / Document 114894Source PDF
- Chief Executives OrderSource: carlowcoco.eplanning.ie / C2c59cae-2fea-4262-a4bd-38e3461c6a45.pdf / Document 114921Source PDF
- Final GrantSource: carlowcoco.eplanning.ie / 383c6126-6c95-4de4-82d1-544b864aed8b.pdf / Document 116697Source PDF
- Planners ReportSource: carlowcoco.eplanning.ie / 7defd839-5303-43d8-bc8f-623e02e5d565.pdf / Document 114896Source PDF
- F I Request LetterSource: carlowcoco.eplanning.ie / 2ba3f543-ee27-440c-a899-7142dd92b0d5.pdf / Document 102165Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- 209The construction of (i) A new treated water storage tank, (ii) New transfer pumps and local control panel within a weather-proof enclosure, (iii) Demolition of contact tanks, (iv) Ancillary development works and (v) Associated temporary development works, including a temporary compound area for the construction period / 0.0 km away / 12 March 2020Granted
- 19292Revisions to portal frame industrial unit as constructed on foor of PL Ref. 16/50. Revisions include reduction of overall floor area, external alterations to include door locations and all associated site development works / 0.1 km away / 13 September 2019Granted
- 2360122Planning permission is sought for the construction of an industrial storage unit with all associated site works, constructed to rear of existing industrial unit / 0.1 km away / 19 April 2024Granted
- 18484For an 8,283msq building accessed from existing industrial park access road, consisting of a single storey industrial unit with a 2 storey linked building consisting of ancillary toilets, canteen, locker room and offices, together with all associated site and landscaping works / 0.2 km away / 15 February 2019Granted
- 19481For the construction of an ESB Sub-Station and all associated works to facilitate the development / 0.2 km away / 24 June 2020Granted
- 17320An extension to existing building consisting of extending existing locker room and new goods inwards/storage area at ground floor level and extending existing office area at first floor level, together with all associated site works. / 0.2 km away / 17 January 2018Granted
- 1777Permission for a manufacturing /storage building adjacent to our existing premises, with new a new entrance off the Royal Oak Industrial Estate Road, together with all associated site and landscaping works / 0.2 km away / 08 May 2017Granted
- 19117For the construction of a car wash base connected to existing services. Other works as part of the development include: widening of existing vehicular entrance to serve the proposed car wash base; landscaping; boundary treatment; and all associated works to facilitate the development / 0.3 km away / 21 May 2019Granted