GrantedDecided 23 October 2025Carlow County Council

Monaughrim, Clonegal, Co. Carlow

Planning application 2560045
DecisionConditional grant
Decided23 October 2025
Application typePERMISSION
Source documents6

Site

What is on file

0refusal reasons11conditions8nearby records

Proposed development

Application description published by Carlow County Council.
To construct a 2-storey extension to the side of existing dwelling with internal alterations to same to accommodate the proposed extension and all associated site works

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

No refusal reason is on record for this application yet.

Conditions

  • 1Development must be carried out in accordance with plans received 23/02/2025, as amended by further information received 02/10/2025.Compliance
  • 2Permission authorises only the development described in public notices and does not relate to other development on site.Compliance
  • 3External finishes, windows, doors, and rainwater goods per elevational drawings (Sheet 3 of 5). Render neutral colour/texture. Stone locally sourced.Design Materials
  • 4Road opening works subject to Road Opening Licence per 'Guidelines for Managing Openings in Public Roads (2017)'. Submit for written agreement prior to commencement.Traffic Access
  • 5Do not impair existing roadside drainage without Municipal District Engineer agreement. No surface water to public road/adjoining properties. All surface water to soakaways/system per B.S. 8301:1985 and BRE Digest 365 with inspection covers. Only clean surface water diverted.Wastewater Drainage
  • 6On-site domestic wastewater treatment system and percolation area/polishing filter per EPA Code of Practice (June 2021). Certificate of Compliance with as-constructed drawings prior to 1st occupation. Test per I.S. EN 12566. Min 1 flush out valve. Construct per WTS01-001 (July 2025). No surface water infiltration. Grease trap installed. Decommission existing septic tank/percolation area.Wastewater Drainage
  • 7Off carriageway parking for all construction traffic. No parking on public road. Prevent debris on road. Maintain neat site. Control noise/dust. No materials on road/footpath without Municipal District Engineer consent.Construction Management
  • 8Construction hours restricted to Mon-Fri 08.00-18.00 and Sat 08.00-13.00. No work on Sundays & Bank Holidays.Construction Management
  • 9Service poles relocated prior to construction at applicants' expense. All ESB, telephone cables, service lines underground except as agreed.Traffic Access
  • 10Comply with Building and Fire Regulations. Fire vehicle access and water supplies per Chief Fire Officer. Consult Chief Fire Officer prior to commencement.Compliance
  • 11Development contribution of €1,671.60 to be paid prior to commencement. Interest at 5% p.a. from grant date.Development Contribution

Planning a project near Monaughrim, Clonegal, Co. Carlow?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.