GrantedDecided 05 March 2024Cork County Council

0.56 hectares site within ESB Aghada Generating Station Ballincarroonig Aghada Co Cork P25 XE94

Planning application 24/4026
DecisionConditional permission
Decided05 March 2024
Application typePermission
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Cork County Council.
The proposed development consists of the construction of a hydrogen production facility comprising a hydrogen compound and contractor’s compound with all associated site access and ancillary site development works. The proposed development will demonstrate the full chain hydrogen production via electrolysis, storage, usage on site via fuel cell and transport offsite to other sector hydrogen users. The proposed development is to be used for hydrogen production for an operational period of up to five years. The proposed development comprises: 1) 1 megawatt (MW) electrolyser including a water purification unit (40-foot (ft) container) (2.5m x 12.2m x 5.4m) with a stack height of 7.7m above ground level, 2) A transformer and control unit container (2.8m x 7.5m x 3.3m) housing a 6.6 kilovolt (kV) to 400kV transformer, 3) A storage container (2.8m x 6.4m x 3.3m), 4) A welfare unit (2.8m x 7.5m x 3.3m), 5) A compressor (20ft container) (2.7m x 6.4m x 4.3m), 6) 5 x 2.5kg low pressure (30 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 7) 3 x 19kg high pressure (300 bar) hydrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 8) 2 x 61kg low pressure (30 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 9) 2 x 31kg high pressure (300 bar) nitrogen storage MCP units (manifolded cylinder pallets) (1m x 1m x 2.1m), 10) 4 x 400kg (high pressure) mobile refuelling hydrogen storage vehicles, 11) 2 x 250 kilowatt (kW) hydrogen power units (2.7m x 7.3m x 5.4m), 12) Heavy goods vehicles (HGV) loading bays with 4m high walls, 13) A palisade fence enclosing the hydrogen compound (2.6m height). In addition to the above, planning permission is also sought for all ancillary site and development works to facilitate the development including the MCP filling area, internal site access road, 3 no. car parking spaces, 2 no. EV chargers, barrier, lighting and CCTV, drainage infrastructure and pipe racks/cable trays. After up to five years in operation, the decommissioning phase of the proposed development will comprise the removal of the electrolyser, transformer and control unit container, compressor, MCP units, mobile refuelling hydrogen storage vehicles, hydrogen power units, storage container and welfare unit from the site and removal of loading bay walls to level in line with the concrete yard. The contractors compound area will be reinstated to its present condition during decommissioning. It is proposed that all utility service connections and all other structures and installations on site including, but not limited to, the hydrogen compound fencing, concrete yard, lighting and CCTV will be retained on site in perpetuity. The proposed development consists of an activity for which an Industrial Emissions Licence is required. ESB Aghada Generating Station is a registered lower tier establishment under the Control of Major Accident Hazard (COMAH) Regulations, 2015. The development will consist of the provision of, or modifications to, an establishment within the meaning of Part 11 of the Planning and Development Regulations (Major Accidents Directive). A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Cork has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near 0.56 hectares site within ESB Aghada Generating Station Ballincarroonig Aghada Co Cork P25 XE94?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →