3671/21: Planning permission for development at the following adjacent sites: Top Oil Yard 1, Promenade Road, Parish of Saint Thomas, Dublin Port, Dublin 3, D03 HK83. Top Oil Yard 2, Tolka Quay Road, Dublin Port. Circle K Yard 2, Tolka Quay Road, Dublin Port. The sites are adjacent to Tolka Quay Road, Promenade Road and 2 Branch Road North Extension. The development consists of constructing two pipebridges with a maximum height of 8.5m to allow new pipework and cables to be routed between the yards. Pipebridge No. 1 will be between Top Oil Yard 1 and the neighbouring Fareplay Yard 2. Pipebridge No. 2 will be between the Top Oil Yard 2 and the neighbouring Fareplay Yard 2. A small concrete shelter in Fareplay Yard 2 is to be dismantled to allow room for pipebridge supports.
Top Oil Yard 1, Promenade Road, Parish of Saint Thomas, Dublin Port, Dublin 3, D03 HK83
DecisionGrant permission
Decided20 January 2022
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Top Oil Yard 1, Promenade Road, Parish of Saint Thomas, Dublin Port, Dublin 3, D03 HK83?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- 3688/20The proposed development consists of dismantling a portion of the Terminal 2 site including a redundant building and a repair shop which will allow new entrance gates and associated boundary works to be carried out to accommodate for two entrance lanes for retail commercial loading tankers. Existing equipment including pumps, samples room, lab, and dye tanks will be relocated as part of the works. A new 30m3 additive tank will be provided. The existing Vapour Recovery Unit in Terminal 2 will be refurbished. Improved information signage for drivers at entrance and loading gantry will be installed and new internal road markings will be painted to identify parking spaces. The Major Accidents Directive is applicable to the site and as such a significant modification assessment has been completed. / 0.2 km away / 08 January 2021Granted
- 3733/20The development will consist of the installation of a new bitumen storage tank of 30m in diameter and 19.2m in height with a volume of approximately 11,300m3 and the installation of an aromatic oil tank of 8m in diameter and 12.8m in height with a volume of approximately 600m3. A concrete containment area will also be installed around the perimeter of the proposed tanks. / 0.2 km away / 05 May 2021Granted
- 4115/19The development will consist of the removal of a redundant fire water storage tank of 7.6m in diameter and 7.5m in height with a volume of approximately 340m3 and the installation of a new bitumen storage tank of 3.37m in diameter and 17.3m in height with a volume of approximately 100m3. / 0.2 km away / 25 November 2019Granted
- 2071/20Planning Permission for development at this site address: Circle K Yard 3, Alexandra Road, Dublin Port, Dublin 1. This site is regulated by the Major Accidents Directive. The development will consist of: Increasing the containment volume of the existing bund. Modifications will include raising the height of the existing bund wall by circa 0.5m, extending the bund to the east and lowering the ground level in the area of this bund extension from approximately 4.07m to 3.8m. The site's storm water, fresh water and foul sewer drainage will be modified to accommodate the bund extension. / 0.3 km away / 12 March 2020Granted
- 4152/19The development consists of: Removal of three bitumen storage tanks of size 60 tonne, 80 tonne & 500 tonne and installation of four bitumen storage tanks of size 50 tonne, 235 tonne, 235 & 15 tonne. Also included is the modification of an existing electrical plant building, modifications include installation of a staircase and additional floor to the building. The new floor of the building will be used as an electrical plant room and will raise the height of the building from approximately 4 metres to 7.3 metres. / 0.3 km away / 28 November 2019Granted
- WEB2497/24Removal of the existing Tank 3 (378.5 tonnes bitumen) and installing Tank 4C (198.45 tonnes bitumen), also adding horizontal walkway from Tank 2 to portion of spiral stair on Tank 4C and another horizontal walkway linking Tank 4B to Tank 4C. / 0.3 km away / 09 January 2025Granted
- 2771/19The development will consist of: Demolition of an existing single storey building and construction of a new two storey building with a footprint of 14.9m by 5.6m. The building will consist of concrete foundations, blockwork walls, an external cladding and plaster finish, a trapezoidal roof, an internal concrete stairs and an external steel stairs. The building will be subdivided into a production area and store at ground floor level and an office and store rooms at first floor level. The building will be connected to the site's existing storm drainage and electrical services. / 0.3 km away / 10 June 2019Granted
- WEB2500/24For development at this site at the former Trim Transport Ltd yard, Tolka Quay Road, Dublin Port, Dublin 1, D01 H977. The subject site comprises of c. 0.147ha within the overall former Trim Transport Ltd site. The development will consist of: •The construction of a single storey modular office building (180sqm) with 2 no. solar photovoltaic panel arrays at roof level and external heat pumps to the rear; •The provision of a storage container (28sqm) to accommodate ancillary storage and a secure sheltered bicycle store; •The provision of site lighting and utility connections;•The replacement of existing access gates with a new 2.25m high vehicular double swing gate and a new 2.25m high pedestrian double swing gate with a 2.5m high concrete wall panel and pier;•The provision of a 2.5m high chain link fence along the northern boundary;•Repairs to / renewal of existing boundary treatments where required; and; •The provision of ancillary car parking, landscaping, servicing and all associated site works. / 0.4 km away / 01 April 2025Granted