Fareplay Terminal 2, Road No.2 North Extension, Dublin Port, Dublin 1
Planning application 3688/20
DecisionGrant permission
Decided08 January 2021
Application typePermission
Source documentsPending
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Dublin City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Dublin City is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Fareplay Terminal 2, Road No.2 North Extension, Dublin Port, Dublin 1?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Source link pending
This application was published at source, but the document inventory has not been bound yet.
Nearby precedent
Similar nearby applications linked to this planning decision.- WEB2056/26The development consists of constructing a pipe bridge with an approximate overall height of 8m with associated concrete supports, to allow new pipelines and cables to be routed between two yards. This pipe bridge will span between the Circle K Terminal, and the pipe track on the opposite side of 2 Branch Road North Ext., outside TOP Yard 1, located in Dublin Port. Signs informing of the clearance height beneath the pipe bridge will also be installed on the bridge. A height restriction barrier with an accompanying sign informing of the clearance space beneath the pipe bridge will be installed over 2 Branch Road North Extension, south of the pipe bridge. / 0.0 km away / 25 June 2026Granted
- 3733/20The development will consist of the installation of a new bitumen storage tank of 30m in diameter and 19.2m in height with a volume of approximately 11,300m3 and the installation of an aromatic oil tank of 8m in diameter and 12.8m in height with a volume of approximately 600m3. A concrete containment area will also be installed around the perimeter of the proposed tanks. / 0.1 km away / 05 May 2021Granted
- 4115/19The development will consist of the removal of a redundant fire water storage tank of 7.6m in diameter and 7.5m in height with a volume of approximately 340m3 and the installation of a new bitumen storage tank of 3.37m in diameter and 17.3m in height with a volume of approximately 100m3. / 0.2 km away / 25 November 2019Granted
- 3671/21Planning permission for development at the following adjacent sites: Top Oil Yard 1, Promenade Road, Parish of Saint Thomas, Dublin Port, Dublin 3, D03 HK83. Top Oil Yard 2, Tolka Quay Road, Dublin Port. Circle K Yard 2, Tolka Quay Road, Dublin Port. The sites are adjacent to Tolka Quay Road, Promenade Road and 2 Branch Road North Extension. The development consists of constructing two pipebridges with a maximum height of 8.5m to allow new pipework and cables to be routed between the yards. Pipebridge No. 1 will be between Top Oil Yard 1 and the neighbouring Fareplay Yard 2. Pipebridge No. 2 will be between the Top Oil Yard 2 and the neighbouring Fareplay Yard 2. A small concrete shelter in Fareplay Yard 2 is to be dismantled to allow room for pipebridge supports. / 0.2 km away / 20 January 2022Granted
- WEB2500/24For development at this site at the former Trim Transport Ltd yard, Tolka Quay Road, Dublin Port, Dublin 1, D01 H977. The subject site comprises of c. 0.147ha within the overall former Trim Transport Ltd site. The development will consist of: •The construction of a single storey modular office building (180sqm) with 2 no. solar photovoltaic panel arrays at roof level and external heat pumps to the rear; •The provision of a storage container (28sqm) to accommodate ancillary storage and a secure sheltered bicycle store; •The provision of site lighting and utility connections;•The replacement of existing access gates with a new 2.25m high vehicular double swing gate and a new 2.25m high pedestrian double swing gate with a 2.5m high concrete wall panel and pier;•The provision of a 2.5m high chain link fence along the northern boundary;•Repairs to / renewal of existing boundary treatments where required; and; •The provision of ancillary car parking, landscaping, servicing and all associated site works. / 0.2 km away / 01 April 2025Granted
- WEB2823/24The replacement of approximately 52 m of existing 2.4 m high chainlink perimeter fencing and associated access / emergency gates with new 2.4 m high security fencing, gates, 2 no. 8 m CCTV poles and all associated site works. / 0.3 km away / 21 February 2025Granted
- 2697/20The development will consist of alterations to the existing North Wall Power Generating station, which include the replacement of existing indoor gas turbines with new and more efficient indoor gas turbines, the replacement of one of the two existing exhaust chimney stack’s (approx. 70m tall) and its re-construction at a reduced height of 65m to mirror the second existing exhaust stack, the installation of new gas compressors with associated fan coolers, the replacement of existing roof-mounted fan coolers, a fuel oil pumphouse, a demineralised water pumphouse, a new 1,000m3 demineralised water tank (approx. 10m tall), a new 1,000m3 gas oil storage tank (approx. 10m tall), the repurposing of an existing 4,000m3 fuel oil storage tank as a demineralised water storage tank of the same volume, a new fire water tank (approx. 10m tall), a new tanker unloading area comprising a concrete pad, emergency diesel generator, a new administration and welfare building, minor modifications to existing surface water drainage, a new entrance opening on to Alexandra Road and revised internal road layout and minor ancillary plant and equipment structures. The development will also comprise the removal of existing structures including; 70m tall stack and associated boiler, part of the administration building, canteen, stores building and water treatment buildings, gas compressor building as well as a water storage tanks, a bottle storage area and other minor redundant installations. The development will also include all other necessary associated works required to enable the construction and operation of the facility. An Environmental Impact Assessment Report (EIAR) has been prepared and is submitted as part of the planning application. It should be noted that this facility is identified as a Lower Tier site under the COMAH directive, furthermore the facility has an existing Industrial Emissions Licence which is regulated by the Environmental Protection Agency. All required licences and plans will be reviewed as required. / 0.3 km away / 17 July 2020Granted
- 4152/19The development consists of: Removal of three bitumen storage tanks of size 60 tonne, 80 tonne & 500 tonne and installation of four bitumen storage tanks of size 50 tonne, 235 tonne, 235 & 15 tonne. Also included is the modification of an existing electrical plant building, modifications include installation of a staircase and additional floor to the building. The new floor of the building will be used as an electrical plant room and will raise the height of the building from approximately 4 metres to 7.3 metres. / 0.4 km away / 28 November 2019Granted