F19A/0167: An amendment to original grant of permission (F16A/0128) to relocate 2
Dublin Airport Logistics Park, St. Margaret's Road, St. Margaret's, Co
DecisionGrant permission
Decided11 June 2019
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW24A/0373EConstruction of a central warehouse & logistics distribution centre, with an overall GFA of c. 26,865 sq.m, including an ancillary office and welfare area of c. 1,352 sq.m. and associated standalone services buildings of c.121 sq.m on a site area of c. 5.238 Ha. The warehouse building is orientated east-west across the subject site, with a primarily rectilinear form complete with stepped ground floor office / staff entry level, located to the west. The proposed warehouse building has an overall length of c. 225 metres, with a depth of c. 126 metres and a parapet height of c. 21 meters above ground level to the North, South and East and c. 24.75 meters to the West. The proposed office has a parapet height of c. 15 meters above ground level. A sprinkler tank with associated pumphouse complete with provision for a generator compound, switch room and transformer room are located along the northern boundary of the site. A substation is proposed centrally on the southern boundary. Parking and office space are orientated towards the front / west of the site, facing the estate entrance. The proposal provides for 161 no. car parking spaces (including 8 no. accessible parking spaces and 35 EV charging spaces), 8 motorcycle spaces, accessed from the southwest of the site. A separate pedestrian and bicycle access to 50 bicycle parking spaces is located centrally on the southern boundary adjacent to the office. A service yard and loading bays are proposed to the south of the building, with a single HGV access point provided in the southeastern corner. There are 24 no. loading docks proposed along with 3 no. grade access doors. Solar panels are proposed for c. 10% of the roof area. Landscaping and screening is proposed throughout the site and along the southern boundary complete with upgrading of pedestrian and bicycle access routes complete with all associated works and services. / 0.1 km away / 06 November 2024Granted
- FW21A/0096The proposed development will consist of plant located outside of the existing warehousing and logistics building granted under FW19A/0143; sprinkler pump house (7 x 6 x 3.6m high), sprinkler tank (8.4m high and 10m diametre), chiller (3.5m x 2.5m x 2.5m high) and oxidiser storage unit (6 x 3 x 3.4m high) in the rear service yard, and a standby generator (4.2m x 1.5m x 2.2m high) to the north of the existing warehouse, all on concrete bases. An ancillary logistics office (69sq.m) and mezzanine plant area (247sq.m) are proposed within the existing warehouse. An additional window (1.35m high x 1.12m wide) and 2 No. relocated doors are proposed along the eastern elevation of the existing building. Additional metal louvres are proposed on the north, south and east elevations. / 0.2 km away / 13 July 2021Granted
- FW19A/0090The proposed development will consist of the installation of 10 No. co / 0.2 km away / 21 November 2019Granted
- FW19A/0143The construction of 2 no. Single-Storey Units for industrial and/or Warehouseuse with ancillary Two-Storey offices with a gross floor area 11,157.90 square meters. The development will also include 2no. ESB substations, ancillary site development works for underground duct work, drainage and utility services, service yards, car parking, signage to the proposed units, the extension of Cedar Drive to the west, on a site area of 2.97 hectares Additional Information Lodged on 5th Dec 2019. Additional Information was deemed SIGNIFICANT on 6th December 2019. Significant Additional Information Public Notices received on 14th Jan 2020 / 0.2 km away / 10 February 2020Granted
- FW20A/0219Permission for an amendment to the original planning permission, at this site, for a gas peaking facility with 10 no. containerised gas fired generating units, with an export capacity of 20 megawatts (MV) under planning reference FW19A/0090. Amendments are proposed to the gas peaking will consist of the installation of 6 no. battery storage units with an export electricity capacity of 10-15 MV and 4 no. containerised gas fired generating units with an export electricity capacity of 10 MV, in replacement for the 10 no. containerised gas fired generating units, granted under planning reference FW19A/0090. 3 no. inverter transformers will also be added to the site, being the battery storage units. Other elements of the development will remain the same as FW19A/0090 and include an underground cabling route c 1.45km along the R135 road. 1 no. single storey electrical substation building, 1 no. customer switch entrance, security gates gear, electrical inverter/transformer station modules, concrete support structures, heating, ventilation and air conditioning units (HC/AV units), underground gas pipework and connection points, access tracks and new site entrance, security gates, perimeter security fencing, CCTV security monitoring system, landscaping works, and all associated ancillary infrastructure. / 0.2 km away / 25 February 2021Granted
- FW20A/0220Retention of an internal 2 storey mezzanine structure providing additional storage consisting of 114 sq.m at intermediate level and 117 sq.m at upper level. / 0.2 km away / 25 February 2021Granted
- FW22A/0068The development will consist of 1 no. building for warehouse/logistics use, to be known as Unit 6, with a gross floor area of 9,821 sq.m. The building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The unit will form part of Phase 2 of Vantage Business Park along with Units 3, 4 and 5 (permitted under reference FW20A/0211), Phase 1 to the south consists of Unit 1 under construction and Unit 2 complete in 2019. The proposed development includes 6 no. HGV parking spaces, 82 no. car parking spaces, 58 no. cycle parking spaces, 8 no. dock levellers and 2 no. grade loading bays. All associated siteworks including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, dry detention basins/swales, lighting, 1 no. free standing sign, security and access control room, signage at entrance, refuse storage, heat pumps and all associated siteworks including drainage infrastructure. / 0.2 km away / 03 June 2022Granted
- FW25A/0500ERetention Permission is sought for the following modifications to Unit No. 3: a new staff entrance with a new external canopy provided over the entrance (north elevation); ground level external plant within a new acoustic louvered enclosure; new paladin security fencing (2.4 meters high) along the eastern and southern boundaries; 2 no. external acoustic louvres on the west elevation; and all associated development works. / 0.3 km away / 27 January 2026Granted