FW22A/0068: The development will consist of 1 no. building for warehouse/logistics use, to be known as Unit 6, with a gross floor area of 9,821 sq.m. The building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The unit will form part of Phase 2 of Vantage Business Park along with Units 3, 4 and 5 (permitted under reference FW20A/0211), Phase 1 to the south consists of Unit 1 under construction and Unit 2 complete in 2019. The proposed development includes 6 no. HGV parking spaces, 82 no. car parking spaces, 58 no. cycle parking spaces, 8 no. dock levellers and 2 no. grade loading bays. All associated siteworks including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, dry detention basins/swales, lighting, 1 no. free standing sign, security and access control room, signage at entrance, refuse storage, heat pumps and all associated siteworks including drainage infrastructure.
Lands between the N2 and R135, Coldwinters, St. Margarets, Co. Dublin.
DecisionGrant permission
Decided03 June 2022
Application typePermission
Source documents23
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 547F1837E73B11ECB6CE9C7BEFBB54FD.tif / Document 752332Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / 61B62E41D75311EC86680050569232A4.docx / Document 817369Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / 9FCF5A57D1BD11EC866800505692A522.docx / Document 819909Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 547F183AE73B11ECB6CE9C7BEFBB54FD.tif / Document 752333Source PDF
- Final GrantSource: planningapi.agileapplications.ie / B5560B7B02CC11ED931984C5A68ABD3E.pdf / Document 763285Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 283FEE2B0D9B11ED9FB3D81265958418.pdf / Document 747253Source PDF
- ReportsSource: planningapi.agileapplications.ie / 188778C5C6FB11EC860B005056926A5C.pdf / Document 744825Source PDF
- ReportsSource: planningapi.agileapplications.ie / 188779F1C6FB11EC860B005056926A5C.pdf / Document 745198Source PDF
- ReportsSource: planningapi.agileapplications.ie / 28F5393CDB7011EC866800505692F02D.doc / Document 746988Source PDF
- ReportsSource: planningapi.agileapplications.ie / 260D6078C6FB11EC860B005056926A5C.pdf / Document 747114Source PDF
- ReportsSource: planningapi.agileapplications.ie / 3689B8DFD1CA11EC866800505692A522.pdf / Document 748231Source PDF
- ReportsSource: planningapi.agileapplications.ie / 589021EEC6FB11EC860B005056926A5C.pdf / Document 752399Source PDF
- ReportsSource: planningapi.agileapplications.ie / 5FD22F06D1CD11EC8668005056923C73.pdf / Document 753310Source PDF
- ReportsSource: planningapi.agileapplications.ie / 74C7776CD52811EC8668005056929533.docx / Document 756286Source PDF
- ReportsSource: planningapi.agileapplications.ie / 886E9079D2A511EC8668005056923C73.docx / Document 758649Source PDF
- ReportsSource: planningapi.agileapplications.ie / 896BE5B0C6FB11EC860B005056926A5C.pdf / Document 759163Source PDF
- ReportsSource: planningapi.agileapplications.ie / B209F4A1D74C11EC86680050569232A4.pdf / Document 763552Source PDF
- ReportsSource: planningapi.agileapplications.ie / B3E950D1DCE111EC866800505692F3B2.docx / Document 763884Source PDF
- ReportsSource: planningapi.agileapplications.ie / 5200012DD03D11EC8668005056925056.docx / Document 816691Source PDF
- ReportsSource: planningapi.agileapplications.ie / B7889909D5F211EC8668005056929A5A.docx / Document 820855Source PDF
- ReportsSource: planningapi.agileapplications.ie / C48BB312D50911EC8668005056929533.pdf / Document 821373Source PDF
- ReportsSource: planningapi.agileapplications.ie / E6F04477DCCC11ECB89284C5A60C64E3.docx / Document 822620Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW18A/0038Amendments to previously approved application (ref FW14A/0162) which c / 0.1 km away / 09 May 2018Granted
- FW14A/0162Permission for (i) Demolition of existing 2 no 2 storey semi detached / 0.1 km away / 24 April 2015Granted
- FW19A/0090The proposed development will consist of the installation of 10 No. co / 0.2 km away / 21 November 2019Granted
- FW20A/0219Permission for an amendment to the original planning permission, at this site, for a gas peaking facility with 10 no. containerised gas fired generating units, with an export capacity of 20 megawatts (MV) under planning reference FW19A/0090. Amendments are proposed to the gas peaking will consist of the installation of 6 no. battery storage units with an export electricity capacity of 10-15 MV and 4 no. containerised gas fired generating units with an export electricity capacity of 10 MV, in replacement for the 10 no. containerised gas fired generating units, granted under planning reference FW19A/0090. 3 no. inverter transformers will also be added to the site, being the battery storage units. Other elements of the development will remain the same as FW19A/0090 and include an underground cabling route c 1.45km along the R135 road. 1 no. single storey electrical substation building, 1 no. customer switch entrance, security gates gear, electrical inverter/transformer station modules, concrete support structures, heating, ventilation and air conditioning units (HC/AV units), underground gas pipework and connection points, access tracks and new site entrance, security gates, perimeter security fencing, CCTV security monitoring system, landscaping works, and all associated ancillary infrastructure. / 0.2 km away / 25 February 2021Granted
- FW19A/0143The construction of 2 no. Single-Storey Units for industrial and/or Warehouseuse with ancillary Two-Storey offices with a gross floor area 11,157.90 square meters. The development will also include 2no. ESB substations, ancillary site development works for underground duct work, drainage and utility services, service yards, car parking, signage to the proposed units, the extension of Cedar Drive to the west, on a site area of 2.97 hectares Additional Information Lodged on 5th Dec 2019. Additional Information was deemed SIGNIFICANT on 6th December 2019. Significant Additional Information Public Notices received on 14th Jan 2020 / 0.2 km away / 10 February 2020Granted
- F19A/0167An amendment to original grant of permission (F16A/0128) to relocate 2 / 0.2 km away / 11 June 2019Granted
- FW21A/0096The proposed development will consist of plant located outside of the existing warehousing and logistics building granted under FW19A/0143; sprinkler pump house (7 x 6 x 3.6m high), sprinkler tank (8.4m high and 10m diametre), chiller (3.5m x 2.5m x 2.5m high) and oxidiser storage unit (6 x 3 x 3.4m high) in the rear service yard, and a standby generator (4.2m x 1.5m x 2.2m high) to the north of the existing warehouse, all on concrete bases. An ancillary logistics office (69sq.m) and mezzanine plant area (247sq.m) are proposed within the existing warehouse. An additional window (1.35m high x 1.12m wide) and 2 No. relocated doors are proposed along the eastern elevation of the existing building. Additional metal louvres are proposed on the north, south and east elevations. / 0.2 km away / 13 July 2021Granted
- FW22A/0027The provision of fencing to site perimeter, new entrance gate, external sprinkler tank and associated sprinkler tank pump room, electical generator module, installation of mechanical air handling unit with associated erection of ductwork and louvered grille to external facade of main warehouse building and all ancilliary works. AI received 22/4/2022 / 0.2 km away / 16 May 2022Granted