FW18A/0038: Amendments to previously approved application (ref FW14A/0162) which c
Kilshane, Newtown North Road (R135), Finglas, Co. Dublin.
DecisionGrant permission
Decided09 May 2018
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW14A/0162Permission for (i) Demolition of existing 2 no 2 storey semi detached / 0.0 km away / 24 April 2015Granted
- FW22A/0068The development will consist of 1 no. building for warehouse/logistics use, to be known as Unit 6, with a gross floor area of 9,821 sq.m. The building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The unit will form part of Phase 2 of Vantage Business Park along with Units 3, 4 and 5 (permitted under reference FW20A/0211), Phase 1 to the south consists of Unit 1 under construction and Unit 2 complete in 2019. The proposed development includes 6 no. HGV parking spaces, 82 no. car parking spaces, 58 no. cycle parking spaces, 8 no. dock levellers and 2 no. grade loading bays. All associated siteworks including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, dry detention basins/swales, lighting, 1 no. free standing sign, security and access control room, signage at entrance, refuse storage, heat pumps and all associated siteworks including drainage infrastructure. / 0.1 km away / 03 June 2022Granted
- FW24A/0178EThe subject site currently has planning permission for 4 no. buildings which are under construction. Units 3, 4 and 5 were granted under Reg. Ref. FW20A /0211 and Unit 6 was granted under FW22A/0068. All units are under construction with units 3, 4 and 5 substantially completed Retention permission is sought for: • Omission of green roof to offices (Units 3 & 4) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (Units 3 & 4) • Landscape works (ground profiling) to Unit 3 • Omission of 1no. grade level access door on Unit 3 North-West Elevation • 9sqm of precast concrete wall has been replaced with curtain walling on the Unit 5 Office North-West Elevation • Hall parapet heights for Units 3,4,5,6 are 235mm lower than Hall parapet heights shown on the 'Permitted including compliance' Elevations Permission is sought for: • Reduction in size of swale adjacent to Unit 3 and relocation of western swale northwards (unit 6) • Amendment of car parking layout to the Unit 4 carpark (reduced from 64 to 63) and Unit 5 (reduced from 58 to 57) • Omission of green roof to offices (units 5 and 6) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (unit 5) • The Vertical feature trims on unit 3, 4, 5 and 6 elevations are omitted • All associated site works. AI Rcvd 08/11/2024 / 0.2 km away / 25 November 2024Granted
- FW20A/0211The development will consist of 3 no. buildings for industrial/warehouse/logistics use (Units 3,4 and 5) with gross floor area of 24,356sq.m. Each building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The units will form Phase 2 of the Vantage Business Park, with Phase 1 to the south (units 1 and 2) under construction. The proposed development includes 39 HGV parking spaces, 224 car parking spaces, 134 cycle parking spaces, 29 dock levellers and 7 grade loading bays. All associated site works including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, swales, lighting, 3 no. free standing signs, signage at entrance, refuse storage, substation, foul pumping station, extension of foul infrastructure from Phase 1, modified vehicular entrance off the R135 (including new entrance gate and pillars) and dedicated new footpath and cycleway along the east side of the R135. Add Info received 5th March 2021. Add Info deemed Significant 9th March 2021. Revised Public Notices received 18th March 2021. / 0.2 km away / 13 April 2021Granted
- FW19A/0090The proposed development will consist of the installation of 10 No. co / 0.3 km away / 21 November 2019Granted
- FW20A/0219Permission for an amendment to the original planning permission, at this site, for a gas peaking facility with 10 no. containerised gas fired generating units, with an export capacity of 20 megawatts (MV) under planning reference FW19A/0090. Amendments are proposed to the gas peaking will consist of the installation of 6 no. battery storage units with an export electricity capacity of 10-15 MV and 4 no. containerised gas fired generating units with an export electricity capacity of 10 MV, in replacement for the 10 no. containerised gas fired generating units, granted under planning reference FW19A/0090. 3 no. inverter transformers will also be added to the site, being the battery storage units. Other elements of the development will remain the same as FW19A/0090 and include an underground cabling route c 1.45km along the R135 road. 1 no. single storey electrical substation building, 1 no. customer switch entrance, security gates gear, electrical inverter/transformer station modules, concrete support structures, heating, ventilation and air conditioning units (HC/AV units), underground gas pipework and connection points, access tracks and new site entrance, security gates, perimeter security fencing, CCTV security monitoring system, landscaping works, and all associated ancillary infrastructure. / 0.3 km away / 25 February 2021Granted
- FW22A/0213The development is within a total site area of up to c. 1 ha. to include 1 no. DSO (Distribution System Operator) electrical substation building. 1 no. customer switchgear, electrical inverter / transformer station modules. 40 no. containerised battery storage units on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, underground cabling route c. 1.45 km to existing ESB 220kV Finglas Electricity Substation, associated electrical cabling and ducting, security gates, palisade perimeter security fencing, CCTV security monitoring system and landscaping works and all associated ancillary site infrastructure. AI received 21/12/22 / 0.3 km away / 19 January 2023Granted
- FW23A/0234The development will consist of the construction of a / 0.3 km away / 22 January 2024Granted