FW24A/0178E: The subject site currently has planning permission for 4 no. buildings which are under construction. Units 3, 4 and 5 were granted under Reg. Ref. FW20A /0211 and Unit 6 was granted under FW22A/0068. All units are under construction with units 3, 4 and 5 substantially completed Retention permission is sought for: • Omission of green roof to offices (Units 3 & 4) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (Units 3 & 4) • Landscape works (ground profiling) to Unit 3 • Omission of 1no. grade level access door on Unit 3 North-West Elevation • 9sqm of precast concrete wall has been replaced with curtain walling on the Unit 5 Office North-West Elevation • Hall parapet heights for Units 3,4,5,6 are 235mm lower than Hall parapet heights shown on the 'Permitted including compliance' Elevations Permission is sought for: • Reduction in size of swale adjacent to Unit 3 and relocation of western swale northwards (unit 6) • Amendment of car parking layout to the Unit 4 carpark (reduced from 64 to 63) and Unit 5 (reduced from 58 to 57) • Omission of green roof to offices (units 5 and 6) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (unit 5) • The Vertical feature trims on unit 3, 4, 5 and 6 elevations are omitted • All associated site works. AI Rcvd 08/11/2024
Vantage Business Park, Coldwinters, St. Margarets, Co Dublin
DecisionGrant permission & grant retention
Decided25 November 2024
Application typePermission and Retention
Source documents11
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Vantage Business Park, Coldwinters, St. Margarets, Co Dublin?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0178E_D.pdf / Document 1039558Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A.0178E_D.pdf / Document 1070728Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0178E_CE.pdf / Document 1039557Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A.0178E_CE.pdf / Document 1070727Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW24A_0178E.pdf / Document 1078552Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A-0178E.docx / Document 1033968Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A-0178E.docx / Document 1035901Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_0178E.docx / Document 1038596Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A0178E.docx / Document 1067401Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_0178E_A.I.docx / Document 1067531Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW20A/0211The development will consist of 3 no. buildings for industrial/warehouse/logistics use (Units 3,4 and 5) with gross floor area of 24,356sq.m. Each building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The units will form Phase 2 of the Vantage Business Park, with Phase 1 to the south (units 1 and 2) under construction. The proposed development includes 39 HGV parking spaces, 224 car parking spaces, 134 cycle parking spaces, 29 dock levellers and 7 grade loading bays. All associated site works including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, swales, lighting, 3 no. free standing signs, signage at entrance, refuse storage, substation, foul pumping station, extension of foul infrastructure from Phase 1, modified vehicular entrance off the R135 (including new entrance gate and pillars) and dedicated new footpath and cycleway along the east side of the R135. Add Info received 5th March 2021. Add Info deemed Significant 9th March 2021. Revised Public Notices received 18th March 2021. / 0.1 km away / 13 April 2021Granted
- FW22A/0213The development is within a total site area of up to c. 1 ha. to include 1 no. DSO (Distribution System Operator) electrical substation building. 1 no. customer switchgear, electrical inverter / transformer station modules. 40 no. containerised battery storage units on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, underground cabling route c. 1.45 km to existing ESB 220kV Finglas Electricity Substation, associated electrical cabling and ducting, security gates, palisade perimeter security fencing, CCTV security monitoring system and landscaping works and all associated ancillary site infrastructure. AI received 21/12/22 / 0.1 km away / 19 January 2023Granted
- FW23A/0234The development will consist of the construction of a / 0.2 km away / 22 January 2024Granted
- FW18A/0038Amendments to previously approved application (ref FW14A/0162) which c / 0.2 km away / 09 May 2018Granted
- FW14A/0162Permission for (i) Demolition of existing 2 no 2 storey semi detached / 0.2 km away / 24 April 2015Granted
- FW22A/0022Development shall consist of the construction of a single storey unit (Unit 26) for industrial and/or Warehouse use with ancillary two storey office with a gross floor area 5,480 square meters. The development will also include an ESB substation, service yard, associated car parking, signage to the proposed unit, the extension of the existing road Cedar Drive to the new proposed unit, service access roads, and all associated landscaping and ancillary site works for underground duct work, drainage and utility services. AI received 24/6/2022 / 0.2 km away / 14 July 2022Granted
- FW19A/0170Construction of a two storey unit for training facility use, with anci / 0.2 km away / 10 December 2019Granted
- F08A/0759/E1A single storey distribution warehouse at Dublin Airport Logistics Par / 0.2 km away / 27 September 2013Granted