FW20A/0211: The development will consist of 3 no. buildings for industrial/warehouse/logistics use (Units 3,4 and 5) with gross floor area of 24,356sq.m. Each building will measure 18.1m high (at parapet level) and have 2 storey ancillary offices. Elevational signage will be provided. The units will form Phase 2 of the Vantage Business Park, with Phase 1 to the south (units 1 and 2) under construction. The proposed development includes 39 HGV parking spaces, 224 car parking spaces, 134 cycle parking spaces, 29 dock levellers and 7 grade loading bays. All associated site works including diversion of existing foul rising main, boundary treatments, landscaping, service yards, internal road and footpaths, swales, lighting, 3 no. free standing signs, signage at entrance, refuse storage, substation, foul pumping station, extension of foul infrastructure from Phase 1, modified vehicular entrance off the R135 (including new entrance gate and pillars) and dedicated new footpath and cycleway along the east side of the R135. Add Info received 5th March 2021. Add Info deemed Significant 9th March 2021. Revised Public Notices received 18th March 2021.
Lands between the N2 and R135 (north of the N2-R135 link road), at Col
DecisionGrant permission
Decided13 April 2021
Application typePermission
Source documents23
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 145EBB6171EC11EB8A673464A927EB6F.tif / Document 702890Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / 873E8C659D1511EB90823464A927EB6F.tif / Document 737094Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 873E8C6F9D1511EB90823464A927EB6F.tif / Document 717622Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / CF5027AD720911EB8A673464A927EB6F.tif / Document 726736Source PDF
- Final GrantSource: planningapi.agileapplications.ie / 0347AEA5B97F11EB862600505692A522.pdf / Document 700342Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 0ACCC8F6154C11EC9E97DA1265958417.pdf / Document 712427Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0863B02A614F11EB84F94CEBBDB3918C.pdf / Document 701309Source PDF
- ReportsSource: planningapi.agileapplications.ie / 1175DE4455D011EB85F2005056926A5C.pdf / Document 702605Source PDF
- ReportsSource: planningapi.agileapplications.ie / 1E3D34E855D011EB85F2005056926A5C.pdf / Document 703824Source PDF
- ReportsSource: planningapi.agileapplications.ie / 06BF68BB705D11EB862500505692C209.docx / Document 708305Source PDF
- ReportsSource: planningapi.agileapplications.ie / 4CB9C23F6F7111EB862500505692E046.docx / Document 709729Source PDF
- ReportsSource: planningapi.agileapplications.ie / 0B5767AA55D011EB85F2005056926A5C.pdf / Document 712451Source PDF
- ReportsSource: planningapi.agileapplications.ie / 744DFCF8648211EB8624005056923C73.pdf / Document 714311Source PDF
- ReportsSource: planningapi.agileapplications.ie / 744DFCFF648211EB8624005056923C73.pdf / Document 715110Source PDF
- ReportsSource: planningapi.agileapplications.ie / 9CE9790E55CF11EB85F2005056926A5C.pdf / Document 719561Source PDF
- ReportsSource: planningapi.agileapplications.ie / 9CE9797255CF11EB85F2005056926A5C.pdf / Document 719711Source PDF
- ReportsSource: planningapi.agileapplications.ie / B33CFB72656811EB862400505692A2FE.pdf / Document 723708Source PDF
- ReportsSource: planningapi.agileapplications.ie / C30E1E116FA111EB862500505692F3B2.docx / Document 724172Source PDF
- ReportsSource: planningapi.agileapplications.ie / D3D896B0979E11EB86260050569232A4.docx / Document 726286Source PDF
- ReportsSource: planningapi.agileapplications.ie / E2121BD58BBB11EB91287066553B9052.pdf / Document 730413Source PDF
- ReportsSource: planningapi.agileapplications.ie / FF247FAC5A6211EB862400505692966A.pdf / Document 731972Source PDF
- ReportsSource: planningapi.agileapplications.ie / FB698809646311EB8624005056923C73.doc / Document 741943Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0213The development is within a total site area of up to c. 1 ha. to include 1 no. DSO (Distribution System Operator) electrical substation building. 1 no. customer switchgear, electrical inverter / transformer station modules. 40 no. containerised battery storage units on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, underground cabling route c. 1.45 km to existing ESB 220kV Finglas Electricity Substation, associated electrical cabling and ducting, security gates, palisade perimeter security fencing, CCTV security monitoring system and landscaping works and all associated ancillary site infrastructure. AI received 21/12/22 / 0.1 km away / 19 January 2023Granted
- FW24A/0178EThe subject site currently has planning permission for 4 no. buildings which are under construction. Units 3, 4 and 5 were granted under Reg. Ref. FW20A /0211 and Unit 6 was granted under FW22A/0068. All units are under construction with units 3, 4 and 5 substantially completed Retention permission is sought for: • Omission of green roof to offices (Units 3 & 4) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (Units 3 & 4) • Landscape works (ground profiling) to Unit 3 • Omission of 1no. grade level access door on Unit 3 North-West Elevation • 9sqm of precast concrete wall has been replaced with curtain walling on the Unit 5 Office North-West Elevation • Hall parapet heights for Units 3,4,5,6 are 235mm lower than Hall parapet heights shown on the 'Permitted including compliance' Elevations Permission is sought for: • Reduction in size of swale adjacent to Unit 3 and relocation of western swale northwards (unit 6) • Amendment of car parking layout to the Unit 4 carpark (reduced from 64 to 63) and Unit 5 (reduced from 58 to 57) • Omission of green roof to offices (units 5 and 6) • Upgrade of Marshalling Yard Oil Interceptor from Bypass to Full Retention Separator (unit 5) • The Vertical feature trims on unit 3, 4, 5 and 6 elevations are omitted • All associated site works. AI Rcvd 08/11/2024 / 0.1 km away / 25 November 2024Granted
- FW23A/0234The development will consist of the construction of a / 0.1 km away / 22 January 2024Granted
- FW22A/0022Development shall consist of the construction of a single storey unit (Unit 26) for industrial and/or Warehouse use with ancillary two storey office with a gross floor area 5,480 square meters. The development will also include an ESB substation, service yard, associated car parking, signage to the proposed unit, the extension of the existing road Cedar Drive to the new proposed unit, service access roads, and all associated landscaping and ancillary site works for underground duct work, drainage and utility services. AI received 24/6/2022 / 0.2 km away / 14 July 2022Granted
- F08A/0759/E1A single storey distribution warehouse at Dublin Airport Logistics Par / 0.2 km away / 27 September 2013Granted
- FW19A/0170Construction of a two storey unit for training facility use, with anci / 0.2 km away / 10 December 2019Granted
- FW25A/0449EPermission is sought to construct a two-story static simulator building with ancillary briefing rooms and store to the rear of the existing building. Additional Information Received 17/12/2025 / 0.2 km away / 20 January 2026Granted
- FW18A/0038Amendments to previously approved application (ref FW14A/0162) which c / 0.2 km away / 09 May 2018Granted