FW12B/0071: Retention of change of use from staff accommodation
Kilshane Kennels, Kilshane, Dublin 11
DecisionRefuse permission for retention
Decided14 November 2012
Application typeRetention
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW23A/0307Planning permission for the extension of the existing car park to provide additional car parking and storage/bin storage hard standing area and all associated site development works. AI Rcvd 23/08/2024 / 0.3 km away / 18 September 2024Refused
- FW21A/0119The proposed development will consist of an extension to the existing access road as previously permitted under Reg. Ref. FW19A/0226. Provision is also made for a roundabout junction at the eastern end of the new road. The planning application area is c. 1.8 hectares. The development includes for pedestrian footpath and cycle-path links from the existing road; provision of all associated trunk utility services shall be provided to serve the adjacent development lands to include surface water drainage infrastructure, foul water drainage infrastructure, watermains, public lighting and associated ancillary works. The proposed development also includes for a single storey security booth (c.22.9m² and a max height of 3.6m); associated security barriers; and 4 no. parking spaces (1 no. being a disabled parking bay). This infrastructure may be removed prior to or upon the road being taking in charge by Fingal County Council. The new section of the road will provide access to existing lands zoned as Heavy Industry (HI) in the current Fingal County Development Plan 2017-2023. The H1 zoned lands which the new access road will service, will be the subject of separate planning applications for development(s) at future dates. / 0.6 km away / 23 August 2021Refused
- FW21A/0250Planning permission is being sought for a development that will consist of the following; 1) The construction of a Gas Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine, 1 no. 28m high Exhaust Stack, 1 no. 2 story Admin Building (c. 680 m2), 1 no. single storey Workshop (c. 661 m2), 1 no. single storey Plant Room Building (c. 608 m2), 1 no. single storey Dew Point Heater Boiler Building (c. 52 m2), 1 no. single storey Electrical Module for Fuel Gas Area Building (c. 45 m2), 1 no. single storey Packaged Electronic Electrical Control Compartment building (PEECC) (c. 150 m2), 1 no. single storey E0Room Building (c. 227 m2), 1 no. single storey Fuel Gas Block Building (152 m2), 1 no. single storey Continuous Emission Monitoring System (CEMS) Building (c. 9 m2), 1 no. single storey Fuel Oil Treatment & Forwarding Building (c.59 m2), an Above Ground Installation (AG() area consisting of 1 no. single storey Instrument Building (c. 28.5 m2), 1 no. single storey Regulator Building (47 m2), 1 no. single store Boiler Building (c. 28 m2), and 1 no. single storey Analyser Kiosk (6 m2), 2 no. 20 m high diesel storage tanks and recessed bund area, 1 no. 17 m high Raw and Fire Fighting Water Tank, miscellaneous plant and equipment. 2) 2. The realignment of a a portion (263 m) of the Kilshane Road within the subject site boundary, including the provision of new footpaths and off0road cycle ways, together with the construction of a new roundabout linking the proposed realignment of Kilshane Road back to the existing road network to the north west of the subject site and to the proposed internal road network to serve the proposed development. 3) The construction of Entrance Gates, 1 no. single storey security office (40 m2 GFA) and a private internal road network providing for vehicular, cyclist and pedestrian access to serve the development. 4) Total provision of 20 no. Car Parking Spaces including 2 no. disabled parking spaces and 4 no. Electrical Charging Points. 5) Provision of lighting columns to serve the development and the installation of Closed-Circuit Television System (CCTV) for surveillance and security purposes. 6) Provision of 20 no. Sheltered Bicycle Parking Spaces. 7) Provision of hard and soft landscaping works, tree planting and boundary treatments. 8) Construction of a Wastewater Treatment Plant and Percolation Area together with a Surface Water Attenuation Area to serve the development. 9) All associated site works necessary to facilitate the development. / 0.8 km away / 10 February 2022Refused
- FW20A/0113The development will consist of a prefabricated storage building, 16m x 5m x 3.3m high, providing a usable floor area of 70 sqm. A clad steel frame structure with double doors to each end of the building will be accessed via compliant steel ramp all sited within the existing yard. / 0.9 km away / 08 September 2020Refused
- FW14A/0027Full planning permission to construct a two storey granny dwelling / 1.0 km away / 17 April 2014Refused
- FW13A/0146Permission for the change of use and extension to the use of the / 1.0 km away / 27 February 2014Refused
- FW20A/0157Permission for the removal of the existing first floor, comprising of a bar & apartment, and construction of 22 No. guest rooms & 2 No. meeting rooms including all ancillary works and associated elevation alterations arising from the development. / 1.0 km away / 23 November 2020Refused
- FW23A/0322The proposed development consists of the following; The demolition of existing dwelling (Bloomburn Cottage, Kilshane, Dublin 11, D11 F1W8) and associated garage, and shed structure to the east of the existing house, and permission for the use of the subject site (c.2.07 HA) as a storage container depot with a maximum capacity of 1,734 no. containers, construction of ancillary office and workshop building (c.359 m2 GFA) construction of security hut (c.9.5 m2 GFA), provision of 9 no. car parking spaces and 6 no. bicycle spaces, provision of 6 no. truck parking spaces and associated vehicle wash down area, new wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment, and vehicular entrance, 10 no. 20 meter high & 3 no. 4 meter high lighting columns with LED luminaries, signage to office and workshop building and all associated site works necessary to facilitate the development. / 1.0 km away / 07 December 2023Refused