FW23A/0322: The proposed development consists of the following; The demolition of existing dwelling (Bloomburn Cottage, Kilshane, Dublin 11, D11 F1W8) and associated garage, and shed structure to the east of the existing house, and permission for the use of the subject site (c.2.07 HA) as a storage container depot with a maximum capacity of 1,734 no. containers, construction of ancillary office and workshop building (c.359 m2 GFA) construction of security hut (c.9.5 m2 GFA), provision of 9 no. car parking spaces and 6 no. bicycle spaces, provision of 6 no. truck parking spaces and associated vehicle wash down area, new wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment, and vehicular entrance, 10 no. 20 meter high & 3 no. 4 meter high lighting columns with LED luminaries, signage to office and workshop building and all associated site works necessary to facilitate the development.
Bloomburn Cottage, Kilshane, Dublin 11, D11 F1W8
DecisionRefuse permission
Decided07 December 2023
Application typePermission
Source documents15
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW23A_0322_CE.pdf / Document 898128Source PDF
- ReportsSource: planningapi.agileapplications.ie / 00111780_E0015Y7D_20231102_1145.pdf / Document 893554Source PDF
- ReportsSource: planningapi.agileapplications.ie / 00111781_E0015Y5T_20231102_1145.pdf / Document 893555Source PDF
- ReportsSource: planningapi.agileapplications.ie / 00111783_E0015Y3W_20231102_1145.pdf / Document 893557Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_Waste_Enforcement.pdf / Document 893899Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_TII.pdf / Document 895136Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_IAA.pdf / Document 895523Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_Transport.pdf / Document 896541Source PDF
- ReportsSource: planningapi.agileapplications.ie / F23A_-_0652_DAA.pdf / Document 897308Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_DHLGH.pdf / Document 897317Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_Parks.pdf / Document 897337Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322.pdf / Document 897480Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_Uisce_Eireann.pdf / Document 898104Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A_-_0322_archaeology.pdf / Document 898149Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW24A/0339EThe proposed development consists of the following: The demolition of two no. existing detached dwellings (Bloomburn Cottage, Kilshane, Dublin 11, D11F1W8 and Kilmonan Lodge, Kilshane, Dublin 11, D11 XP89) and associated garages and shed structures, and permission for the use of the subject site (c. 2.52 Ha) as a storage container depot with a maximum capacity of c. 1,270 no. containers in 9 no. blocks ranging in height between 3 no. and 6 no. containers high, with 2 no. 8.7 mt. high reefer gantries, construction of ancillary single storey detached office and workshop building (c. 363 m2 GFA), construction of single storey detached prefabricated security hut (c. 9.5 m2 GFA), provision of 9 no. car parking spaces including 1 no. disabled persons car parking space and 1 no. electric vehicle charging space, 2 no. motorcycle parking spaces, 6 no. bicycle spaces and bicycle shelter and provision of 8 no. truck parking spaces, new onsite wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment and vehicle entrance onto L3120 Kilshane Road, 9 no. 20mt. high, 7 no. 10mt. high and 5 no. 6mt. high lighting columns with LED luminaries and all associated site works necessary to facilitate the development. The Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, K67 X8Y2 (to inspect Planning Applications on all lands). A submission or observation in relation to the Application may be made in writing to the Planning Authority on payment of a fee of €20, within the period of 5 weeks, beginning on the date of receipt by Fingal County Council of the Application, and such submissions or observations will be considered by the Planning Authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions or may refuse to grant permission. / 0.0 km away / 10 October 2024Refused
- FW24A/0045The proposed development consists of the following: The demolition of existing dwellings (Bloomburn Cottage, Kilshane, Dublin 11, D11F1W8) and (Kilmonan Lodge, Kilshane, Dublin 11, D11 XP89) and associated garages, and shed structures, and permission for the use of the subject site (C 2.52 HA) as a storage container depot with a maximum capacity of 1,596 no. Containers, with 2no. 8.7 mt. high reefer gantries, construction of ancillary office and workshop building (c. 359 m2 GFA), construction of security hut (c. 9.5 m2 GFA), provision of 9 no. car parking spaces and 6no. bicycle spaces, provision of 9 no. truck parkingspaces and associated vehicle wash down area, new wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment, and vehicle entrance, 9 no. 30mt. high 7no. 10mt. high and 5 no. 6mt. high lighting columns with LED luminaries, signage to office and workshop building and all associated site works necessary to facilitate the development. / 0.1 km away / 28 March 2024Refused
- FW21A/0250Planning permission is being sought for a development that will consist of the following; 1) The construction of a Gas Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine, 1 no. 28m high Exhaust Stack, 1 no. 2 story Admin Building (c. 680 m2), 1 no. single storey Workshop (c. 661 m2), 1 no. single storey Plant Room Building (c. 608 m2), 1 no. single storey Dew Point Heater Boiler Building (c. 52 m2), 1 no. single storey Electrical Module for Fuel Gas Area Building (c. 45 m2), 1 no. single storey Packaged Electronic Electrical Control Compartment building (PEECC) (c. 150 m2), 1 no. single storey E0Room Building (c. 227 m2), 1 no. single storey Fuel Gas Block Building (152 m2), 1 no. single storey Continuous Emission Monitoring System (CEMS) Building (c. 9 m2), 1 no. single storey Fuel Oil Treatment & Forwarding Building (c.59 m2), an Above Ground Installation (AG() area consisting of 1 no. single storey Instrument Building (c. 28.5 m2), 1 no. single storey Regulator Building (47 m2), 1 no. single store Boiler Building (c. 28 m2), and 1 no. single storey Analyser Kiosk (6 m2), 2 no. 20 m high diesel storage tanks and recessed bund area, 1 no. 17 m high Raw and Fire Fighting Water Tank, miscellaneous plant and equipment. 2) 2. The realignment of a a portion (263 m) of the Kilshane Road within the subject site boundary, including the provision of new footpaths and off0road cycle ways, together with the construction of a new roundabout linking the proposed realignment of Kilshane Road back to the existing road network to the north west of the subject site and to the proposed internal road network to serve the proposed development. 3) The construction of Entrance Gates, 1 no. single storey security office (40 m2 GFA) and a private internal road network providing for vehicular, cyclist and pedestrian access to serve the development. 4) Total provision of 20 no. Car Parking Spaces including 2 no. disabled parking spaces and 4 no. Electrical Charging Points. 5) Provision of lighting columns to serve the development and the installation of Closed-Circuit Television System (CCTV) for surveillance and security purposes. 6) Provision of 20 no. Sheltered Bicycle Parking Spaces. 7) Provision of hard and soft landscaping works, tree planting and boundary treatments. 8) Construction of a Wastewater Treatment Plant and Percolation Area together with a Surface Water Attenuation Area to serve the development. 9) All associated site works necessary to facilitate the development. / 0.3 km away / 10 February 2022Refused
- FW21A/0247Permission for (i) demolition of existing dwelling and construction of 1 no. two storey replacement dwelling. (ii) Relocation and upgrade of an existing domestic vehicular access from the existing North Road, R135 and (iii) all associated ancillary works necessary to facilitate the development including wastewater treatment system and percolation area, SUDS surface water drainage, site works, boundary treatments and landscaping. / 0.6 km away / 10 February 2022Refused
- FW12B/0071Retention of change of use from staff accommodation / 1.0 km away / 14 November 2012Refused
- FW23A/0307Planning permission for the extension of the existing car park to provide additional car parking and storage/bin storage hard standing area and all associated site development works. AI Rcvd 23/08/2024 / 1.0 km away / 18 September 2024Refused
- FW21A/0119The proposed development will consist of an extension to the existing access road as previously permitted under Reg. Ref. FW19A/0226. Provision is also made for a roundabout junction at the eastern end of the new road. The planning application area is c. 1.8 hectares. The development includes for pedestrian footpath and cycle-path links from the existing road; provision of all associated trunk utility services shall be provided to serve the adjacent development lands to include surface water drainage infrastructure, foul water drainage infrastructure, watermains, public lighting and associated ancillary works. The proposed development also includes for a single storey security booth (c.22.9m² and a max height of 3.6m); associated security barriers; and 4 no. parking spaces (1 no. being a disabled parking bay). This infrastructure may be removed prior to or upon the road being taking in charge by Fingal County Council. The new section of the road will provide access to existing lands zoned as Heavy Industry (HI) in the current Fingal County Development Plan 2017-2023. The H1 zoned lands which the new access road will service, will be the subject of separate planning applications for development(s) at future dates. / 1.4 km away / 23 August 2021Refused
- F15A/0542The construction of an agricultural building with canopy and associate / 1.4 km away / 20 January 2016Refused