FW24A/0045: The proposed development consists of the following: The demolition of existing dwellings (Bloomburn Cottage, Kilshane, Dublin 11, D11F1W8) and (Kilmonan Lodge, Kilshane, Dublin 11, D11 XP89) and associated garages, and shed structures, and permission for the use of the subject site (C 2.52 HA) as a storage container depot with a maximum capacity of 1,596 no. Containers, with 2no. 8.7 mt. high reefer gantries, construction of ancillary office and workshop building (c. 359 m2 GFA), construction of security hut (c. 9.5 m2 GFA), provision of 9 no. car parking spaces and 6no. bicycle spaces, provision of 9 no. truck parkingspaces and associated vehicle wash down area, new wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment, and vehicle entrance, 9 no. 30mt. high 7no. 10mt. high and 5 no. 6mt. high lighting columns with LED luminaries, signage to office and workshop building and all associated site works necessary to facilitate the development.
Bloomburn Cottage, Kilshane, Dublin 11, D11 F1WB., and Kilmonan Lodge,
DecisionRefuse permission
Decided28 March 2024
Application typePermission
Source documents12
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0045_D.pdf / Document 1025937Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0045_D.pdf / Document 1025940Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0045_CE.pdf / Document 1025936Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0045_CE.pdf / Document 1025939Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_-_0045_Archaeology.pdf / Document 1023637Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_-_0045_Parks.pdf / Document 1024800Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_-_0045_WS.pdf / Document 1025023Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A0045_Environment_Reponse_to_Planning.pdf / Document 908308Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_-_0045_UE.pdf / Document 908371Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A0045_IAA_Response_Letter.pdf / Document 908733Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A0045__Stateline_Transport_Ltd._TII_submission_issued_06.03.2024.pdf / Document 950331Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW24A/0339EThe proposed development consists of the following: The demolition of two no. existing detached dwellings (Bloomburn Cottage, Kilshane, Dublin 11, D11F1W8 and Kilmonan Lodge, Kilshane, Dublin 11, D11 XP89) and associated garages and shed structures, and permission for the use of the subject site (c. 2.52 Ha) as a storage container depot with a maximum capacity of c. 1,270 no. containers in 9 no. blocks ranging in height between 3 no. and 6 no. containers high, with 2 no. 8.7 mt. high reefer gantries, construction of ancillary single storey detached office and workshop building (c. 363 m2 GFA), construction of single storey detached prefabricated security hut (c. 9.5 m2 GFA), provision of 9 no. car parking spaces including 1 no. disabled persons car parking space and 1 no. electric vehicle charging space, 2 no. motorcycle parking spaces, 6 no. bicycle spaces and bicycle shelter and provision of 8 no. truck parking spaces, new onsite wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment and vehicle entrance onto L3120 Kilshane Road, 9 no. 20mt. high, 7 no. 10mt. high and 5 no. 6mt. high lighting columns with LED luminaries and all associated site works necessary to facilitate the development. The Planning Application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority during its public opening hours. Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin, K67 X8Y2 (to inspect Planning Applications on all lands). A submission or observation in relation to the Application may be made in writing to the Planning Authority on payment of a fee of €20, within the period of 5 weeks, beginning on the date of receipt by Fingal County Council of the Application, and such submissions or observations will be considered by the Planning Authority in making a decision on the application. The Planning Authority may grant permission subject to or without conditions or may refuse to grant permission. / 0.1 km away / 10 October 2024Refused
- FW23A/0322The proposed development consists of the following; The demolition of existing dwelling (Bloomburn Cottage, Kilshane, Dublin 11, D11 F1W8) and associated garage, and shed structure to the east of the existing house, and permission for the use of the subject site (c.2.07 HA) as a storage container depot with a maximum capacity of 1,734 no. containers, construction of ancillary office and workshop building (c.359 m2 GFA) construction of security hut (c.9.5 m2 GFA), provision of 9 no. car parking spaces and 6 no. bicycle spaces, provision of 6 no. truck parking spaces and associated vehicle wash down area, new wastewater treatment system and percolation area, surface water attenuation area, hard and soft landscaping works, new boundary treatment, and vehicular entrance, 10 no. 20 meter high & 3 no. 4 meter high lighting columns with LED luminaries, signage to office and workshop building and all associated site works necessary to facilitate the development. / 0.1 km away / 07 December 2023Refused
- FW21A/0250Planning permission is being sought for a development that will consist of the following; 1) The construction of a Gas Turbine Power Generation Station with an output of up to 293 Megawatts. The proposed station will consist of 1 no. Gas Turbine, 1 no. 28m high Exhaust Stack, 1 no. 2 story Admin Building (c. 680 m2), 1 no. single storey Workshop (c. 661 m2), 1 no. single storey Plant Room Building (c. 608 m2), 1 no. single storey Dew Point Heater Boiler Building (c. 52 m2), 1 no. single storey Electrical Module for Fuel Gas Area Building (c. 45 m2), 1 no. single storey Packaged Electronic Electrical Control Compartment building (PEECC) (c. 150 m2), 1 no. single storey E0Room Building (c. 227 m2), 1 no. single storey Fuel Gas Block Building (152 m2), 1 no. single storey Continuous Emission Monitoring System (CEMS) Building (c. 9 m2), 1 no. single storey Fuel Oil Treatment & Forwarding Building (c.59 m2), an Above Ground Installation (AG() area consisting of 1 no. single storey Instrument Building (c. 28.5 m2), 1 no. single storey Regulator Building (47 m2), 1 no. single store Boiler Building (c. 28 m2), and 1 no. single storey Analyser Kiosk (6 m2), 2 no. 20 m high diesel storage tanks and recessed bund area, 1 no. 17 m high Raw and Fire Fighting Water Tank, miscellaneous plant and equipment. 2) 2. The realignment of a a portion (263 m) of the Kilshane Road within the subject site boundary, including the provision of new footpaths and off0road cycle ways, together with the construction of a new roundabout linking the proposed realignment of Kilshane Road back to the existing road network to the north west of the subject site and to the proposed internal road network to serve the proposed development. 3) The construction of Entrance Gates, 1 no. single storey security office (40 m2 GFA) and a private internal road network providing for vehicular, cyclist and pedestrian access to serve the development. 4) Total provision of 20 no. Car Parking Spaces including 2 no. disabled parking spaces and 4 no. Electrical Charging Points. 5) Provision of lighting columns to serve the development and the installation of Closed-Circuit Television System (CCTV) for surveillance and security purposes. 6) Provision of 20 no. Sheltered Bicycle Parking Spaces. 7) Provision of hard and soft landscaping works, tree planting and boundary treatments. 8) Construction of a Wastewater Treatment Plant and Percolation Area together with a Surface Water Attenuation Area to serve the development. 9) All associated site works necessary to facilitate the development. / 0.3 km away / 10 February 2022Refused
- FW21A/0247Permission for (i) demolition of existing dwelling and construction of 1 no. two storey replacement dwelling. (ii) Relocation and upgrade of an existing domestic vehicular access from the existing North Road, R135 and (iii) all associated ancillary works necessary to facilitate the development including wastewater treatment system and percolation area, SUDS surface water drainage, site works, boundary treatments and landscaping. / 0.6 km away / 10 February 2022Refused
- FW12B/0071Retention of change of use from staff accommodation / 1.0 km away / 14 November 2012Refused
- FW23A/0307Planning permission for the extension of the existing car park to provide additional car parking and storage/bin storage hard standing area and all associated site development works. AI Rcvd 23/08/2024 / 1.1 km away / 18 September 2024Refused
- FW21A/0119The proposed development will consist of an extension to the existing access road as previously permitted under Reg. Ref. FW19A/0226. Provision is also made for a roundabout junction at the eastern end of the new road. The planning application area is c. 1.8 hectares. The development includes for pedestrian footpath and cycle-path links from the existing road; provision of all associated trunk utility services shall be provided to serve the adjacent development lands to include surface water drainage infrastructure, foul water drainage infrastructure, watermains, public lighting and associated ancillary works. The proposed development also includes for a single storey security booth (c.22.9m² and a max height of 3.6m); associated security barriers; and 4 no. parking spaces (1 no. being a disabled parking bay). This infrastructure may be removed prior to or upon the road being taking in charge by Fingal County Council. The new section of the road will provide access to existing lands zoned as Heavy Industry (HI) in the current Fingal County Development Plan 2017-2023. The H1 zoned lands which the new access road will service, will be the subject of separate planning applications for development(s) at future dates. / 1.3 km away / 23 August 2021Refused
- FW21A/0219Planning permission for the construction of as 24-hour fuel card refuelling depot including; # Hard surfaced forecourt accommodating 4no. HCV and 2no. LCV fuel dispensers; Cover canopy; Underground tank farm and associated infrastructure (e.g. vent stack and fill points); # New vehicular entrance and exit points off R135; # Detached plant room; # 2.4m high palisade security fencing and new eastern (roadside) boundary wall; # Internal landscaping; # Erection of 19no. single head free standing lighting columns; # Erection of 7m high free-standing double-sided identifier totem sign with illuminated lettering; # Surface water attenuation and drainage system; # Widening of existing footpath to 2m and construction of continuing 2m wide footpath along eastern boundary with R135; # Creation of a right turning lane on R135; # Relocation of existing bus stop and speed limit poles and signs to back of altered existing footpath and all associated site and development works. # A Stage 2 Appropriate Assessment (Natura Impact Statement) has been prepared in respect of the proposed development. / 1.3 km away / 19 January 2022Refused