FW14A/0128: Planning permission for the change of use of an internal storage area
Damastown Industrial Park, Mulhuddart, Dublin 15
DecisionGrant permission
Decided02 December 2014
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Damastown Industrial Park, Mulhuddart, Dublin 15?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW14A/0007Permission for the demolition the 188 Geodis/IBM Link Structure locate / 0.0 km away / 26 March 2014Granted
- FW13A/0126Permission for modifications to planning permission register ref FW13A / 0.1 km away / 16 December 2013Granted
- FW19A/0232The construction of a Data Centre comprised of 4 no. buildings consisting of (a) Data Hall Building, (48,303 sq.m) 4 storey building with plant room over (b) Generator Building, (4,064 sq.m) 4 storey building over a single basement level, (c) Sprinkler Pump House building, (119 sq m.) single storey building, and (d) Security Hut, (21 sq.m.) single storey building with associated security barrier system, and the formation of a new vehicular entrance onto Damastown Avenue, 102 no. car parking spaces including 6 no. disabled car parking spaces, 30 no. cycle spaces, internal site roads and hardstanding, site lighting, perimeter security fencing and gates, site signage, soft landscaping, SUDS drainage system, and all other associated site works, on a 2.6709 hectare site at Damastown Avenue, Damastown Industrial Park, Macetown Middle, Mulhuddart, Dublin 15. Additional Information Lodged on 22nd May 2020 Clarification of Add Info received 27th August 2020 / 0.1 km away / 23 September 2020Granted
- FW12A/0036Change of use of 2,224sqm of gournd floor space of exsting 14,564sqm m / 0.2 km away / 12 June 2012Granted
- FW25A/0207EThe development will consist of material alterations and a change of use in part of the existing ground floor area within an existing manufacturing, testing, warehousing, and office facility. The proposed change of use is from manufacturing to recreational use/staff welfare facilities (including mindfulness room, gym, changing rooms and showers) to provide employee amenity space for the sole use of staff employed at the facility. The development will also include: The installation of a new roller shutter door to the rear of the building; The demolition of an existing link corridor between Building 2 and Building 3, and all associated site works. / 0.2 km away / 30 June 2025Granted
- FW11A/0024Change of use of 555sqm of ground floor space of existing 14,564sqm ma / 0.3 km away / 11 May 2011Granted
- FW25A/0234EKyndryl Ireland Limited, intend to apply for planning permission for a development at: Building 5, Technology Campus, Damastown Drive, Damastown Industrial Park, Dublin 15, D15 K82N. The development will consist of the construction of a new 68 sqm external ESB Substation with incorporated Client Switchroom to the North West of Building 5, with new underground cabling and associated infrastructure to link to ESB infrastructure at Damastown Avenue via wayleave to adjoining site, and all associated site development works above and below ground. Additional Information Received 24/07/25 Clarification of Additional Information received 04/09/25 / 0.3 km away / 23 September 2025Granted
- FW15A/0150Permission for an 834 sq.m warehouse extension to a logistics warehou / 0.3 km away / 26 January 2016Granted