North Campus, Maynooth University, Maynooth
Planning application 201003
DecisionConditional grant
Decided21 October 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near North Campus, Maynooth University, Maynooth?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Source documents
Original council portal records and source PDFs where available.Included in site brief
1 council document — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- 18922A 10 year permission for development comprising of; the construction of a 2 to 4 storey Academic Building of c.10,554m2 gross floor area, deliverable in one or two phases; Phase 1 (c.5,287m2) comprising two lecture theatres and public foyer, teaching spaces, seminar and collaboration spaces, café (c.192m2), exhibition spaces, meeting rooms, enclosed and open plan offices, breakout spaces, PV panels and roof level plant, and Phase 2 (5,267m2) comprising one lecture theatre, teaching spaces, seminar and collaboration spaces, research reading rooms, exhibition spaces, meeting rooms, enclosed and open plan offices, break out spaces, PV panels and roof level plant; 60no. bicycle parking spaces; all arranged around a new courtyard with associated landscaping and site development works on a site (c.1.17ha) located south of the existing Science Building, on a portion of the existing campus ring road and adjacent to the access point to the north campus from the Kilcock Road, Maynooth / 0.1 km away / 27 February 2019Granted
- 2360538For relocating existing revolving door entrance and adding an additional revolving door to the front elevation of the building along with all associated site development works / 0.1 km away / 20 February 2024Granted
- 2460394For the removal of an existing standby generator (700kVA) to the north of St. Patrick’s College and installation of a new standby generator, at a different location to the west of John Paul II Library, with a capacity of 1400kVA, fuel storage tank, electrical installations, protective bund along with all associated site development works to include protective perimeter fencing to compound. The application site is located within Maynooth Architectural Conservation Area. / 0.1 km away / 24 June 2024Granted
- 22894For existing development on the north campus, Maynooth University, Maynooth, Co. Kildare. The existing development consists of a temporary tensile structure currently in use providing outdoor sheltered seating along with all associated site development works / 0.2 km away / 08 September 2022Granted
- 181073Phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall / 0.2 km away / 08 January 2019Granted
- 24107Extension of Duration of Planning Ref. 18/1073 - phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall / 0.2 km away / 03 May 2024Granted
- 2560037For amendments to an existing approved car-park layout (Reg. Ref. No. 23/763). The development will consist of (i) increasing the overall number of parking spaces from 31 to 36, to include 3 new accessible car-parking spaces, 2 of which will be EV charging spaces,5 new standard EV charging spaces; and 12 no Bicycle bays for staff (ii) new access road layout with new separate pedestrian entrance & access footpath layout; (iii) new drop-off spaces for mini buses with one new EV charging mini bus drop-off point; (iv) new boundary fences, walls and gates including new perforated fence with school logo; (v) new signage to the boundaries and directional signage as required; (vi) new hard & soft-landscaping and Sensory Garden; (vii) provision of a new external glazed canopy to create a covered drop-off area & a covered pathway to the school building from the drop-off zones; (viii) 3 new flagpoles and, all associated site development works. / 0.3 km away / 14 March 2025Granted
- 22796Development on the north campus, Maynooth University. The development will consist of the installation of 8 No. stand alone modular study pod units along with all associated site development works / 0.3 km away / 22 August 2022Granted