University Library Building, South Campus Maynooth University, Maynooth
Planning application 2360538
DecisionConditional grant
Decided20 February 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near University Library Building, South Campus Maynooth University, Maynooth?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460394For the removal of an existing standby generator (700kVA) to the north of St. Patrick’s College and installation of a new standby generator, at a different location to the west of John Paul II Library, with a capacity of 1400kVA, fuel storage tank, electrical installations, protective bund along with all associated site development works to include protective perimeter fencing to compound. The application site is located within Maynooth Architectural Conservation Area. / 0.1 km away / 24 June 2024Granted
- 201003Installation of a sculpture along with all associated site development works / 0.1 km away / 21 October 2020Granted
- 18922A 10 year permission for development comprising of; the construction of a 2 to 4 storey Academic Building of c.10,554m2 gross floor area, deliverable in one or two phases; Phase 1 (c.5,287m2) comprising two lecture theatres and public foyer, teaching spaces, seminar and collaboration spaces, café (c.192m2), exhibition spaces, meeting rooms, enclosed and open plan offices, breakout spaces, PV panels and roof level plant, and Phase 2 (5,267m2) comprising one lecture theatre, teaching spaces, seminar and collaboration spaces, research reading rooms, exhibition spaces, meeting rooms, enclosed and open plan offices, break out spaces, PV panels and roof level plant; 60no. bicycle parking spaces; all arranged around a new courtyard with associated landscaping and site development works on a site (c.1.17ha) located south of the existing Science Building, on a portion of the existing campus ring road and adjacent to the access point to the north campus from the Kilcock Road, Maynooth / 0.1 km away / 27 February 2019Granted
- 22894For existing development on the north campus, Maynooth University, Maynooth, Co. Kildare. The existing development consists of a temporary tensile structure currently in use providing outdoor sheltered seating along with all associated site development works / 0.2 km away / 08 September 2022Granted
- 181073Phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall / 0.3 km away / 08 January 2019Granted
- 17837Change of use of Unit 4 from retail use to café/restaurant use; internal alterations to the unit; alterations to existing façade; the erection of associated signage to the unit’s façade; provision of associated mall seating area to the front of the unit; and all associated works necessary to facilitate the development / 0.3 km away / 07 November 2017Granted
- 24107Extension of Duration of Planning Ref. 18/1073 - phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall / 0.3 km away / 03 May 2024Granted
- 20255The removal of existing, non-original, internal partition walls at the existing staircase at St. Patrick’s Quadrangle, the making of a new door opening to the existing staircase at St. Patrick’s Quadrangle from the existing Servery, the removal of existing, non-original, internal partition walls at the existing Kitchen, the construction of new partition walls in new locations at the existing Kitchen, the removal of existing, non-original walls at Ground Floor level and First Floor level to the existing annexe to the Kitchen, the construction of a new staircase and passenger lift within the existing annexe to serve the existing First Floor Office/Meeting/Seminar Room, the construction of a new lobby and new WC’s at First Floor level to the existing First Floor Office/Meeting /Seminar Room, the re-roofing of the existing flat roof to the existing annexe and all associated site development works / 0.3 km away / 15 June 2020Granted