In the townland of Collegeland, St. Patrick’s College, Maynooth
Planning application 2460394
DecisionConditional grant
Decided24 June 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near In the townland of Collegeland, St. Patrick’s College, Maynooth?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360538For relocating existing revolving door entrance and adding an additional revolving door to the front elevation of the building along with all associated site development works / 0.1 km away / 20 February 2024Granted
- 18922A 10 year permission for development comprising of; the construction of a 2 to 4 storey Academic Building of c.10,554m2 gross floor area, deliverable in one or two phases; Phase 1 (c.5,287m2) comprising two lecture theatres and public foyer, teaching spaces, seminar and collaboration spaces, café (c.192m2), exhibition spaces, meeting rooms, enclosed and open plan offices, breakout spaces, PV panels and roof level plant, and Phase 2 (5,267m2) comprising one lecture theatre, teaching spaces, seminar and collaboration spaces, research reading rooms, exhibition spaces, meeting rooms, enclosed and open plan offices, break out spaces, PV panels and roof level plant; 60no. bicycle parking spaces; all arranged around a new courtyard with associated landscaping and site development works on a site (c.1.17ha) located south of the existing Science Building, on a portion of the existing campus ring road and adjacent to the access point to the north campus from the Kilcock Road, Maynooth / 0.1 km away / 27 February 2019Granted
- 201003Installation of a sculpture along with all associated site development works / 0.1 km away / 21 October 2020Granted
- 22894For existing development on the north campus, Maynooth University, Maynooth, Co. Kildare. The existing development consists of a temporary tensile structure currently in use providing outdoor sheltered seating along with all associated site development works / 0.2 km away / 08 September 2022Granted
- 181073Phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall / 0.3 km away / 08 January 2019Granted
- 24107Extension of Duration of Planning Ref. 18/1073 - phased refurbishment of the existing Arts Building. The building is located in the academic core of the North Campus and is bounded to the north by the Bio-Sciences Building, to the west by the Callan Building and Arts Annex, to the east by the John Hume Building and to the south by the Science Building. The development will comprise the refurbishment and enhancement of the existing single storey Arts Building (c.4,405sqm) to provide reconfigured teaching spaces, social spaces, accessible lift and bathroom/shower/changing areas in addition to ancillary plant/storage space. The works will also include alterations to access points (with c.107sqm to be demolished) and external elevations; associated external works; the addition of roof lights existing internal courtyard to provide new atrium space; and the provision of screened plant space at roof level resulting in a building of c.4,678sqm overall / 0.3 km away / 03 May 2024Granted
- 22796Development on the north campus, Maynooth University. The development will consist of the installation of 8 No. stand alone modular study pod units along with all associated site development works / 0.3 km away / 22 August 2022Granted
- 20255The removal of existing, non-original, internal partition walls at the existing staircase at St. Patrick’s Quadrangle, the making of a new door opening to the existing staircase at St. Patrick’s Quadrangle from the existing Servery, the removal of existing, non-original, internal partition walls at the existing Kitchen, the construction of new partition walls in new locations at the existing Kitchen, the removal of existing, non-original walls at Ground Floor level and First Floor level to the existing annexe to the Kitchen, the construction of a new staircase and passenger lift within the existing annexe to serve the existing First Floor Office/Meeting/Seminar Room, the construction of a new lobby and new WC’s at First Floor level to the existing First Floor Office/Meeting /Seminar Room, the re-roofing of the existing flat roof to the existing annexe and all associated site development works / 0.3 km away / 15 June 2020Granted