Purcellsinch Industrial Estate, Purcellsinch, Kilkenny
Planning application 17182
DecisionConditional grant
Decided17 May 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Purcellsinch Industrial Estate, Purcellsinch, Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22436For the following works: the extension of the existing car parking areas to comprise of an additional 30 no. car parking spaces in total in 2 separate locations (22 no. spaces in one location and 8 no. spaces in a second location) including landscaping works and associated ancillary site works / 0.0 km away / 22 February 2023Granted
- 22259For the following works.: The development will consist of the change of use from office use to apprenticeship workshops and classrooms, extension of unit with the construction of a first floor, external alteration to the façade of the building including new door and window layouts, and all other associated ancillary site works / 0.1 km away / 13 June 2022Granted
- 18588For building elevation alterations, new car park layout within the existing site boundary, minor demolitions, and all site and ancillary works at / 0.1 km away / 26 October 2018Granted
- 17814For retention and completion of alterations to include the following: 1. For elevational modifications to include the provision of 5 no. new door openings. 2. For elevational modifications to include the provision of a new canopy. 3. New loading bay/dock leveler. 4. Provision of 17 no. car parking spaces all associated site development works / 0.2 km away / 15 March 2018Granted
- 2660237For Installation/erection of temporary office accommodation, using Portakabin Konstructa modules, on Veolia Water ireland Ltd property / 0.2 km away / 12 June 2026Granted
- 21165To construct an extension to the existing external lay down area for plant, machinery and materials together with all associated site works to our facility / 0.2 km away / 02 September 2021Granted
- 19515For a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development / 0.2 km away / 13 September 2019Granted
- 17818For development which will consist of the construction of a 100MW Battery Energy Storage System (BESS) with associated balance of plant, equipment and buildings including; a BESS building of 8m height, 82m length and 44m width (comprising on the ground floor a battery rack room, meeting room, Contractor/Storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, Inverter rooms; and on a mezzanine floor a HVAC/Store room); 2 no. 905m3 firewater storage tanks; an underground 830m3 surface water attenuation tank; an underground 1030m3 firewater retention tank; a 110KV electrical substation and control building of 5.2m height; an access and circulation road with new junction onto an existing IDA private road; footpath, 8 no. car parking spaces; landscaped berm wall up to 2.0m height and native tree and scrub planting, 3m paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the developments / 0.2 km away / 10 May 2018Granted