Unit M, Purcellsinch Business Park, Dublin Road Purcellsinch
Planning application 22259
DecisionConditional grant
Decided13 June 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit M, Purcellsinch Business Park, Dublin Road Purcellsinch?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22436For the following works: the extension of the existing car parking areas to comprise of an additional 30 no. car parking spaces in total in 2 separate locations (22 no. spaces in one location and 8 no. spaces in a second location) including landscaping works and associated ancillary site works / 0.0 km away / 22 February 2023Granted
- 17182For the change of use of the following: 1. Change of use of existing industrial building to training facility 2. Change of use of existing offices to training facility 3. Link Canopy between two existing buildings and all associated site development works / 0.1 km away / 17 May 2017Granted
- 17814For retention and completion of alterations to include the following: 1. For elevational modifications to include the provision of 5 no. new door openings. 2. For elevational modifications to include the provision of a new canopy. 3. New loading bay/dock leveler. 4. Provision of 17 no. car parking spaces all associated site development works / 0.1 km away / 15 March 2018Granted
- 18588For building elevation alterations, new car park layout within the existing site boundary, minor demolitions, and all site and ancillary works at / 0.1 km away / 26 October 2018Granted
- 2660237For Installation/erection of temporary office accommodation, using Portakabin Konstructa modules, on Veolia Water ireland Ltd property / 0.2 km away / 12 June 2026Granted
- 19515For a 10 year planning permission for the construction of a Battery Energy Storage System (BESS). The BESS will consist of: up to 10 no. containerised battery storage modules (up to 14.6m in length, 2.8m in height and 2.4m in width) and ancillary equipment including up to: 14 no. transformers, 28 no. inverters, 14 no. ring main units; a 38kV electrical substation and ESB substation building (10m in length, 6.2m in height and 7.4m in width); electrical equipment building (20m in length, 8.2m in height and 7.4m in width); underground surface water attenuation tank; underground foul storage tank; access and internal circulation road with new junction onto existing IDA private road; 6 no. car parking spaces; landscaped berm wall up to 2m height and native tree and scrub planting, screening wall up to 3m height; 3m high paladin security fence; and all other associated site development works including surface water and foul drainage required to facilitate the development / 0.2 km away / 13 September 2019Granted
- 17772Retention for material change of use from storage area to office area; located at first floor level to Unit No 8. Retention of 12 No. carparking spaces to the front of Unit No.8. Permission to interconnect Units No 7 and No 8 at first floor level. Retention for material change of use from storage area to office area and staff canteen; located at first floor level to Unit No.7. And all associated site development works / 0.2 km away / 12 June 2018Granted
- 2334For the construction of a truck service and maintenance building, ancillary to existing warehouse and logistics facility, comprising portal frame metal clad structure and including roof mount PV Solar Cells. The development will include relocation of existing car park spaces and all associated siteworks / 0.2 km away / 04 October 2023Granted