Purcellsinch Industrial Estate, Purcellsinch, Kilkenny
Planning application 18588
DecisionConditional grant
Decided26 October 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Purcellsinch Industrial Estate, Purcellsinch, Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17814For retention and completion of alterations to include the following: 1. For elevational modifications to include the provision of 5 no. new door openings. 2. For elevational modifications to include the provision of a new canopy. 3. New loading bay/dock leveler. 4. Provision of 17 no. car parking spaces all associated site development works / 0.1 km away / 15 March 2018Granted
- 2334For the construction of a truck service and maintenance building, ancillary to existing warehouse and logistics facility, comprising portal frame metal clad structure and including roof mount PV Solar Cells. The development will include relocation of existing car park spaces and all associated siteworks / 0.1 km away / 04 October 2023Granted
- 2481For the construction of a warehouse building on the Northwestern portion of the site of their existing warehouse and logistics facility, comprising a portal frame metal clad structure and including roof mounted PV Solar Cells. The development will include a 2988 m2 ground floor space, loading bay facilities located at the Southeastern end of the building, access through existing site entrance, the closing of the existing entrance to the Northwestern portion of the site, connection to existing services on site, modification to existing concrete yards, relocation of existing car park spaces and all associated site works / 0.1 km away / 18 February 2025Granted
- 22259For the following works.: The development will consist of the change of use from office use to apprenticeship workshops and classrooms, extension of unit with the construction of a first floor, external alteration to the façade of the building including new door and window layouts, and all other associated ancillary site works / 0.1 km away / 13 June 2022Granted
- 17182For the change of use of the following: 1. Change of use of existing industrial building to training facility 2. Change of use of existing offices to training facility 3. Link Canopy between two existing buildings and all associated site development works / 0.1 km away / 17 May 2017Granted
- 22436For the following works: the extension of the existing car parking areas to comprise of an additional 30 no. car parking spaces in total in 2 separate locations (22 no. spaces in one location and 8 no. spaces in a second location) including landscaping works and associated ancillary site works / 0.2 km away / 22 February 2023Granted
- 17772Retention for material change of use from storage area to office area; located at first floor level to Unit No 8. Retention of 12 No. carparking spaces to the front of Unit No.8. Permission to interconnect Units No 7 and No 8 at first floor level. Retention for material change of use from storage area to office area and staff canteen; located at first floor level to Unit No.7. And all associated site development works / 0.2 km away / 12 June 2018Granted
- 18112Is sought for retention and completion of alterations at the Kilkenny Enterprise Centre, IDA Ireland, Purcellsinch Business Park, Dublin Road, Kilkenny currently under construction to include the following: 1. Retention permission is sought for the increased first floor area to Unit no. 3 of 46 sq m for office use. 2 Retention permission is sought for the increased first floor area to Unit no. 4 of 94 sq m. for office use. 3. Retention permission is sought for the increased first floor area to Unit no. 5 of 46 sq m for office use. 4. Material change of use from store to office use of 46 sq m at first floor level of Unit no. 3. 5. Material change of use from store to office use of 92 sqm at first floor level of Unit no. 4. 6. Material change of use from store to office use of 46 sqm at first floor level of Unit no. 5. 7. Internal modifications to Units no. 3, 4, and 5. 8. For completion of new surface car park area of 1846 sq m with all associated site development works / 0.2 km away / 12 June 2018Granted