Site No.3, Aghamore, Lanesboro
Planning application 2295
DecisionConditional grant
Decided16 June 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Longford County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Longford has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site No.3, Aghamore, Lanesboro?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560129The proposed construction of an industrial/commercial unit with onsite car parking, connections to existing services and all ancillary site works / 0.1 km away / 05 November 2025Granted
- 2360124The proposed development will comprise: • the replacement (“restringing”) of the existing overhead line circuit conductor wires with a new higher capacity conductor including installation of a new fibre communication connection; • the replacement of 52no. existing polesets and 4no. towers - any replacement structures will be constructed at, or immediately adjacent to the existing structures they will replace, will be along the same alignment as existing; • the replacement of angle mast AM3A with a poleset; • the retention and refurbishment, steel member replacement, painting and foundation strengthening of the one retained end mast EM1; • the replacement of hardware and fittings at all structure locations; • the replacement of stay arrangements at 27no. locations; • the replacement of crossarms at 27no. locations; • the installation of insulators at 13no. locations; • the replacement of vibration dampers at 12no. locations; • the reinstallation of all anti-climbing guards; • the reinstallation of aircraft warning spheres at span 127-128; • all associated works within the existing Lanesboro 110 kV substation to accommodate the uprated 110 kV OHL including uprating of the Mullingar bay in Lanesboro 110 kV substation, routing of fibre optic cable from end mast into substation and alterations to existing hardware; • all associated temporary site development works to gain access to the existing structures including clearance of vegetation, disassembly and reassembly of gate posts / piers and removal and reinstatement of existing fencing; and • other temporary associated and ancillary site development works required for the purpose of the uprate of the existing circuit, including construction compounds, silt traps, silt fences, stone tracks, ground protection mats, infrastructure crossing support systems and temporary watercourse crossings / 0.2 km away / 17 October 2023Granted
- 2283The conversion of the first floor of former dwelling house (over existing commercial ground floor) to residential apartment with construction of 7.2m2 extension at first floor level to the rear providing for 55m2 one bed first floor apartment with provision of 1 additional parking bay to rear serving same and associated works / 0.2 km away / 30 May 2022Granted
- 17209The proposed completion of existing partially constructed housing development to include the construction of 31 No. dwelling houses that was previously granted full planning permission under planning reference number PL04/272 consisting of 12 No. two storey three bedroom semi-detached type dwelling houses, 1 No. two storey three bedroom type dwelling house, 6 No. two storey four bedroom semi-detached type dwelling houses, 12 No. two storey two bedroom semi-detached type dwelling houses, completion of green open spaces, completion of existing access roads, proposed connections to existing foul sewer, surface water and watermain networks and all ancillary site works / 0.3 km away / 10 November 2017Granted
- 20263(i) retention of existing extended commercial storage yard and (ii) permission to lay a sealed surface across the extent of the yard, installation of drainage gullies and by-pass interceptor, provision of 5 additional car parking spaces and a dedicated loading area, dedicated storage areas, provision of road signage, line marking and associated site works / 0.3 km away / 03 March 2021Granted
- 19158Planning permission for the proposed construction of an astro turf playing pitch together with perimeter fencing, erection of lighting poles with lighting and all ancillary works / 0.3 km away / 31 July 2019Granted
- 22275An underground electrical cable and transformer compound which will connect permitted solar farms within the townlands of Middleton, Ballycore, Treanboy, Newtown, Ballynakill, Bunacloy to the national grid via the proposed transformer compound at Lough Ree Power Station (within the townland of Aghamore). The Development will consist of the following components 1) and 2): 1) installation of 110kV:33kV Transformer (TRAFO) Compound on private lands at Lough Ree Power Station, within the townland of Aghamore, with associated equipment including; cable sealing end (CSE) surge arrestor (SA), earth disconnect (ED) current/voltage transformer (CT/VT) house transformer (HT) circuit breaker (CB) 1 x lightening mast (LM) at approx. 8m tall, associated underground cabling connection to the existing 110kV underground cable, diesel generator, security fence, removal of portacabins, use of and realignment of the existing access road and associated works, drainage provision, temporary construction compound and also predevelopment site investigation works. 2) installation of underground 33kV medium Voltage electrical cable with associated ducting primarily on private lands within the townlands of Kilnacarrow, Ballynakill, Cloonkeel, Derryaroge, Cloonbearla, Mount Davys, Cloonbony and Aghamore. 5.77km of the route is located on private lands with0.011km to be located on the L52652 local road and L-11623 local road. The cable installation will include the installation of 7 no. joint bays with associated communication chambers, ancillary development and also pre-development site investigation works. The underground cable is intended to connect the permitted Middleton House Solar Farm (Planning ref: 18/135) and "Middleton House Solar Farm" Bunacloy extension (Planning Ref: 21/225) to the national grid via the proposed transformer compound at Lough Ree Power Station within the townland of Aghamore. Temporary construction compounds to facilitate the installation of the cable will be located along the underground grid connection route. Part of the proposed development site lies within the boundary of Lough Ree Power Station which is licenced by the Environmental Protection Agency under an Industrial Emissions (IE) Licence Ref. P0610-02). Permission is sought for a period of 10 years / 0.3 km away / 17 April 2023Granted
- 2098Retention of an existing grain silo Covid 19(b) / 0.3 km away / 08 July 2020Granted