To construct a single storey, split level dwelling while demolishing an existing single storey dwelling, upgrading existing entrance, detached garage, new waste water treatment system, percolation area, bored well, and all associated site works
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Cloghna , Milford , Co. Carlow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
8% of nearby decided applications were refused. The preview found 436 nearby planning records within 5 km where a location match is available.
- Matched source
- 21424
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Retention planning permission for the revisions to dwelling as constructed on foot of planning ref 01/167. Revisions include internal & external alterations and revised entrance location. Retention planning permission is also sought for as constructed detatched domestic garage and all other associated site works.
Development will consist of a new two storey dwelling extending to c.235msq. The proposal also includes associated site works including a new entrance gateway and lane, a septic tank unit, associated treatment systems, new boundary fencing and hedge and required services connections
To construct a dwelling house, domestic garage, waste water treatment system, percolation area, new bored well, new splayed entrance and associated site work
A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
To demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works
Source match
Matched from public planning record 21424The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report