For the erection of a permanent health and safety sign including all ancillary site works, at the entrance to Glenmore Wind Farm
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Boolynaknockaun , Kilmaley , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 35 nearby planning records within 5 km where a location match is available.
- Matched source
- 19869
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
For development which will consist of a 10 year planning permission for the construction and operation of battery arrays (240 number units, each 1.87m2 by c. 2.32m tall), a control building with gross floor area 140m2 by 6.40m tall, 3 number 12MVA transformers (c. 3.5m tall), 1 number 2.5MVA transformer (c. 2.5m tall) and inverters (24 number units, each 1.85m2 by c. 2.22m tall. The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The development will have a 35 year operational lifetime. The overall development site is ca. 1.42 hectares (ha)
For development which will consist of the installation of battery arrays located within container units (18 number units, each 30m2 by c. 2.6m tall) a control building (c 160.5m2 by c.6.4m tall) and transformer (c. 5m tall). The development will include for ancillary infrastructure including security fencing, lighting, CCTV, Internal access roads & drainage. The overall development site is c.1.4Ha.
Is sought for the continued operation of the existing Booltiagh Wind Farm as permitted by An Bord Pleanala Ref: 03.120616 (Clare County Council Pl. Ref: 00/567) for a further period of 10 years from the date of the expiry of the current planning permission (30th September 2025) per Condition no. 2 of the consent issued and for the decommissioning of the wind farm at the end of that further period. The proposed development development does not comprise any modifications to the existing operational wind farm. The proposed development comprises: a) 12 no. existing GE Energy 1.5 Megawatt (MW) wind turbines with a maximum overall blade tip height of 90 metres (m) including hardstands; b) Existing site access tracks and car parking spaces; c) all existing associated underground electrical and communications cabling connecting the turbines to onsite substation (onsite substation consented under ABP 03.120616, amended and made permanent under Pl. Ref: 11/34, and amended under ABP 03.245273; d) Existing gated site entrance from Creegh - Kilmaley local road; e) Existing site drainage; f) All existing ancillary infrastructure, associated site fencing and signage; and g) Implementation of a decommissioning plan. All elements of the wind farm are pre-existing and it is not proposed to make any alterations to the current site layout, wind turbines or associated infrastructure as part of this application. an Environmental Impact Assessment Report (EIAR) accompanies the planning application
Of alterations and changes to dwelling house and septic tank, as constructed, from grant of permission reference P8/26445
For development at lands at Crossmore County Clare in the townlands of Furroor, Illaunatoo or Sorrelisand, Boolynakockaun and Booltiagh. The development will consist of: 1. Amendment to item (1) of Permitted Development Pl. Ref: 21/1057 to install a 38kV electrical connection over a total length of approximately 11km, from the permitted Crossmore Wind Farm (Pl. Ref: 09/123, as extended under Pl. Ref: 19/388 and altered by Pl. Ref: 20/284) to the entrance to the existing Booltiagh 110kV electrical substation. This amended connection will consist of: a. Revision to site boundaries as permitted under Pl. Ref: 21/1057; b. Removal of permitted overhead line from permitted polesets north of Local Road L2084 (previously numbered polesets 1-40 consented under Pl. Ref: 21/1057) for a distance of circa 4km and its replacement with c. 6.5km of underground electrical cabling along unnamed Local Roads. c. Relocation of permitted poleset number 40 (consented under Pl. Ref: 21/1057) 7m (meters) south. Redesign of poleset number 40 from double (as permitted under Pl. Ref: 21/1057) to triple (termination) poleset. The entirety of the grid connection from Crossmore Wind Farm to the existing Booltiagh 110kV electrical substation will therefore comprise c. 5.5km of overhead line (poleset numbers 41-93 conscented under Pl. Ref: 21/1057) c. 6.5km of underground cable (proposed under subject application) 2. Site Drainage 3. All associated site development and ancillary works. The application will be accompanied by a Natura Impact Statement (NIS)
The full report covers all 35 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record 19869The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report