Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 737 decisions within 5 km, 5 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will comprise of continuance use of the existing quarry development within an overall application area of c.24.7 hectares; extraction to the permitted level of 40m below Ordnance Datum, within the extraction area permitted under Plan. Reg. 03/4570; final restoration of the quarry void area and an area of 3.8 hectares to the North adjacent to the public road. Permission is sought for twenty years plus two years for final restoration (total duration 22 years). Permission is also being sought for an extension to the existing operating hours for the ready mixed concrete plant for out of hours operation of the plant up to a maximum of 40 occasions per year, to supply critical and strategic building/infrastructure/maintenance projects whose construction requires supply of concrete outside normal plant operating hours. An Environmental Impact Assessment Report has been prepared for the planning application.
Ext. of an existing quarry over an area of 19.9ha, and the deepening of the quarry floor from the level permitted under Reg. Ref. 99/3410 to 40m below Ordnance Datum, relocation and reconfiguration of existing 38kv electricity supply pole sets that traverse the southeast of the site, and all other associated development incl. the restoration works of the final quarry void (Extractive Area) and an area of 3,8 ha to the north adjacent to the public rd. (Rd Frontage Restoration Area). The development also consists of the retention of the northern and southern quarry faces over an area of 0.872ha from the extent of the quarry faces permitted under Reg. Ref. 99/3410 at Barryscourt, Rossmore, Carrigtohill. Extension of Duration of Permission granted under Planning Reference: 03/4570.
The construction of 2 no. new ESB substation & distribution room buildings and the decommissioning of an existing ESB substation and all associated site works.
Permission to (A) Decommission existing septic tank and percolation area serving existing dwelling and (B) install a new septic tank and percolation area.
Permission to construct a new dwelling house.
The implementation of a landscaping scheme to provide for the screening and landscaping of the northern boundary of the site using existing overburden materials, within an application area of 3.55 hectares.
The brief summarizes the pattern across all 737 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21/5965The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief