Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 3,880 decisions within 5 km, 1 exact-site or onsite candidate record, and 490 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
490 structured nearby appeal records.
490 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for development at a parcel of Land immediately south of Ballycoolin Road ( L3080) in the townland of Cappoge between Rosemount Business Park (north) and Premier Business Park (east) ( ITM X: 710273, y:739735) for the construction and establishment of an Electric Vehicle (EV) Bus Depot. The Proposed Development forms part of the NTA's Bus Connects programme. Spanning approximately 4 hectares within an urban industrial area south of Ballycoolin Road in Cappoge, Co. Dublin, the depot will accommodate around 176 buses. The Proposed Development will also accommodate administrative offices, maintenance facilities, electrical substation, and parking spaces. In all, the Proposed Development will consist of the following: • Administrative offices (including atrium entrance) (ground floor: 1,240m2, first floor: 1,280m2, total: 2,520m2); • Vehicle washing and cleaning building (1,120m2); • Major and minor repairs and maintenance bays/workshop/stores (ground floor: 2,250m2, first floor: 430m2, total: 2,680m2); • Gate, entrance, and security hut; • Vehicle inspection bays/hut (530m2); • Electrical substation compound (2,700m2); • Seven transformer buildings at 60m2 each; • Car parking (approximately 57 standard, three accessible bays, six for motorcycle, and six for EVs), catering to diverse transportation needed (1,700m2); • Bus parking bays (176 spaces); • Cycle parking (24m2); • Architecturally designed boundary fencing: 1.8m high fence along Ballycoolin Road and 4.5m high fencing around the remainder of the site's perimeter; • Two vehicle crossings on the eastern boundary for site access; • A separate vehicle crossing for direct ESB substation access; • Minor upgrades to the public road (eastern access road) including road grading, reshaping mounding refreshing line markings, new cycle ramps and removal of barriers; • Landscaping including native tree planning/shrubs and various amenity areas and SuDS features throughout the site; • Earthworks, construction activities and all ancillary site development works. Additional Information received 19/12/25 Clarification of Additional Information received 24/02/2026
Retention permission is being sought for 368.87m2 of floor space, including ground floor area (347.34m2) and first floor area (21.53m2) measuring a maximum height of 13.5m above ground level within the existing building permitted under previous Planning Permission FW13A/0053 and a 51 m long constructed boundary wall along the western boundary of the site consisting of a 2.7m high concrete wall with a 19m high palisade fence atop (total height 4.6m). Additional Information Lodged on 5th Dec 2019 Significant Additional Information Public Notices received on 19th Dec 2019 Clarification of Additional Information lodged on 25th March 2020
Permission for development an an existing C&D waste facility. The proposed development at the 0.75 ha site is for an increase in the rate of waste acceptance and processing at the facility up to 49,500 tonnes per annum, comprising mixed construction and demoliton (C&D) wastes. The planning application is accompanied by an Environmental Impact Assessment Report.
The proposed development will consist of the construction of an industrial development facility for the processing and distribution of fresh and used cooking oils (UCO) including ancillary offices and staff amenities, roof-mounted photovoltaic array, delivery vehicle maintenance building, external covered storage area, weighbridge, lorry wash, tank farm, fuel tanks, signage, lighting, landscaping, car/lorry/trailer parking areas, and all associated site development works. Access to the proposed development will be from the existing industrial estate road abutting the site to the west that connects to the Ballycoolin Road to the north. A Local Authority permit (Recovery Code 13) is required for the used cooking oil process. AI received 09/05/23
Construction of a distribution, washing and processing facility for fresh and used cooking oils; including offices, delivery vehicle maintenance, weightbridge, tank farm, lorry wash, external covered storage, signage, fuel tanks, ancillary accommodation and associated site works. Local Authority permits required for used cooking oil process, storage and transfer and for the collection, temporary storage and transfer of food waste (Class 10 operations, along with Disposal Code 15 & Recovery Code 13). AI received 22/6/2022 AI deemed significant ** Revised Public notices received 30/6/2022
Permission for a pallet handling facility. The development will consist of; (A) The inclusion of a Kiln structure for drying wooden pallets, 100m2 x 6m high, plus removal of an existing external wash bay - all positioned to the rear of the existing warehouse on site. (B) Removal of a part build unauthorised shed, 500m2, 6.9m high, and planning permission for relocation of part of this structure, 365m2, 6.9m high and completion as a dry pallet store building. (C) Relocation of existing ancillary carpark spaces to the front (east) of the existing building at the site entrance along with other associated site plan adjustments & completions such as widening of site access from 6m to 10m including associated kerb & footpath adjustments, surfacing the existing yard with concrete over the existing compacted stone and placing associated surface water drainage including surface water attenuation. (D) Removal of existing shed measuring, 110m2, 5.6m high, currently centrally located in yard. Using the yard as a pallet store for the pallet repair and dispatch business by providing 950m2 external storage at three locations on site, including associated ancillary HGV parking area 315m2. Add Info received 27th January 2021. Add Info deemed Significant 2nd February 2021. Revised Public Notices received 5th February 2021.
The brief summarizes the pattern across all 3,880 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record FW25A/0296EThe site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief