Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 481 decisions within 5 km, 3 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To extend the appropriate period of Planning Permission P17/583 for the further completion of construction of Westpark Business Campus with the construction of Block 6000, (immediately south of existing Block 7000), a mixed use, multi-storey block, similar to that granted under parent planning permission under Clare County Council PA Ref: P01-1066 and APB Ref: PL03.130244. Block 6000 will have a total gross internal area of 12,045 sqms with offices at upper floors 300-500 and data centre/light industrial / storage/ Research and Development uses at lower levels 100-200. The construction of an ancillary, multi-deck carpark (MDCP) located to the South of Block 4000 within the Campus. The MDCP will accommodate 580 spaces and will replace the existing, 101 at grade, split level, car park located to the South of Block 4000. The car park will also replace the 500 spaces MDCP to the South of the Campus, granted by Clare County Council under Ref: P01-1066 and APB Ref PL03-130244. The proposed development will use existing drainage services in place within the overall campus and the existing road network. The development includes, landscaping, ancillary parking adjacent to Block 6000, ESB Substation, service areas for goods vehicles. The application includes all other ancillary site development works as required to complete the block
For the further completion of construction of Westpark Business Campus with the construction of Block 6000 ( immediately south of existing Block 7000), for a building of five storeys ( with an additional area for mechanical plant on the roof area ) on the western portion of the proposed building facing into the centre of the Campus with a further two basement storeys linking into a proposed, ancillary, multi-deck car park ( MDCP) to the east of the site. Block 6000 will have a total gross floor area of 10,800 sqms for office use. The office building includes ancillary services including, secure internal, cycle parking with staff toilets and shower facilities. The ESB sub station and mechanical plant areas are contained within the office building. The proposed development will use existing drainage services in place within the overall Campus and the existing road network. The development includes all other ancillary site development works as required to complete the block
To Retain and Maintain and, Continue to use established, temporary ancillary car parking areas associated with the development and operation of the Westpark Business Campus.
For 4 No face illuminated wall signs to replace existing 1 No non-illuminated freestanding sign to replace existing and 1 No new non-illuminated freestanding sign
For the following development on the site, consisting of; construction of a new 47 m2 bunded modular extension including an underground bund, A new external covered solvent storage area and bund, New concrete yard, New access landing, ramp, steps & railings, Removal of an existing LPG tank, and All ancillary site development works and services to facilitate the development including drainage, and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (No. IEL P0020-03) authorised by the Environmental Protection Agency
For development at Precision Engineering Ltd., Block O109, Shannon Industrial Estate, Shannon, Co. Clare. The development will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and all associated siteworks
The brief summarizes the pattern across all 481 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221062The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief