Applications tied to the site
Partial coverage15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 728 decisions within 5 km, 15 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
15 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
15 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a new two storey bin washer centre extension to the north elevation of the existing manufacturing building consisting of a new bin washer centre at ground floor with walk-on-ceiling above and plant and equipment room at first floor level. Works include alterations to existing internal layout including all necessary demolitions and modifications as well as all associated site development works including diversion of existing and process water drainage, new surface water and process water draining tie-ins, demolition of existing external ramp, modifications to external stair, new pedestrian paths and vehicular safety barrier.
Construct a new two storey annex with fire escape stairs to the western elevation of an existing manufacturing building, together with the development of an access road for the relocated Intermediate Bulk Container Bund, at the plant facility in Carrigtwohill, including associated ancillary site works. The ground floor will consist of a cleanroom to be utilised for the operation of small batch product packaging operations and the first floor will be utilised to house plant and equipment associated with ground floor cleanroom. Site works will include the relocation of existing Gas Bottle Storage, as well as relocation of an existing Aco channel drain servicing the external yard area. Demolitions and alterations to the existing western facade are required to tie the new structure into the existing building
The construction of, at our existing facility in the townlands of Anngrove and Killacloyne, Carrigtwohill, co. Cork, a new warehouse (5,176m2) which incorporates a 3 storey area over the loading bays, a two storey connection corridor to the existing building (970m2), a site security building (110m2), a logistic yard, a contractor compound, an extension to the existing staff carpark and an access road on the western boundary of the existing site. Works will include required alterations to the existing internal layout, all necessary demolitions and modifications as well as all associated site development works, including a new surface water connection to the existing industrial estate infrastructure, internal roads, retaining structures, plant areas, pedestrian foot paths, modifications to the site boundary frnce line and new vehicular access barriers
Demolition of the existing external canopy and stairs to the east of the existing 2-storey admin building; construction of a 2-storey extension linking the existing 2-storey admin building with the existing 3-storey packaging building, to provide an extended canteen area, additional offices, and cleanroom; rooftop plant, including new screen over the existing and proposed rooftop plant rooms, and a roof cat ladder; and modifications to the internal road network to the south of the proposed development to allow for vehicle circulation. The proposed development will also include the provision of 9no. new accessible parking spaces within the existing car park, and the construction of an extension to the west of the existing car park to provide an additional 137no. car parking spaces, (including 14no. electric vehicle spaces as well as chargers), as well as new lighting, an internal pedestrian and vehicular link to the existing car park, and a new access from the existing internal IDA Business & Technology Park road; new waste compound area; all site development, drainage and landscaping works.
Installation of photovoltaic panels on the existing rooftop of the packaging and warehouse buildings. The proposed development will comprise of 1,458 no. new photovoltaic panels, total area of 3,340 m sq. on a mix of roof mounted and ballasted frames together with all ancillary cabling and electrical infrastructure modules over 3 phases.
Permission for upgrade works to two existing controlled pedestrian crossings at the IDA Business and Technology Park. The works include installing raised crossing points, new section of footpath, line marking, traffic poles with lights and tactile paving. We also intend to install a new raised uncontrolled crossing at the roundabout at the rear of the IDA Business and Technology Park. These works include upgrade works to the existing footpath, installation of a raised crossing point, new sections of footpath, tactile paving and line marking.
The brief summarizes the pattern across all 728 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19/4200The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief