PlanIntelPlanning precedent preview

Planning precedent report

The Clayton Hotel Dublin Airport, Stockhole Lane, Clonshaugh Road, Clo

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

9% of nearby decided applications were refused. The preview found 5,028 nearby planning records within 5 km where a location match is available.

Matched source
F18A/0042
Project type
One-off house
Coverage
5 km radius
5,028Nearby applications
9%Refused
4,580Conditional grants
12Refusal reasons

Top refusal reasons nearby

Residential Amenity3
Visual Amenity3
Design2
Traffic Sightlines2
Premature Services1

Nearest similar decisions

F18A/0042

The proposed development will consist of the erection of a freestandin

Granted0.0 km15 March 2018
F25A/0379E

The development to be retained consists of an existing sign on western elevation of the hotel. The proposed development will consist of the removal of this existing sign, the erection of a replacement sign (17.045m x 1.62m, luminated by white LEDs, giving full face static illumination) and all other associated site development works. Additional information received 18/08/2025

Granted0.0 km08 September 2025
F25A/0862E

The development predominantly comprises of retention permission for various amendments to the development permitted under Fingal County Council Planning Reference F22A/0079. Specifically, 1 no. additional high power electric vehicle charging unit, 6 no. additional parking spaces, and bollards, existing modular substation in lieu of previously approved substation, 3 no. additional lighting columns, various signage elements, and all associated site development works. Plus permission for proposed c 1.2 - 2.0m high hedging and low level planting between EV charging facilities and road.

Granted0.1 km17 November 2025
F22A/0079

The development will consist of the: (i) Installation of 4 no. electric vehicle charging bays, each comprising a parking space and electric vehicle charging units, (ii) Installation of electric vehicle power units, (iii) Construction of a new substation, (iv) Erection of associated signage, (v) All assoiated lighting, infrastructure and site development works.

Granted0.1 km12 April 2022
F18A/0705

Construction of a single storey standalone cafe unit with a gross flor

Refused0.2 km13 February 2019
F19A/0534

Construction of a single storey office building of 134sq.m. gross floor area, located at ground floor level to the permitted decked car park. Mechanical plant will be provided above at deck level of the car park and will be screened by a pergola. The proposed development also includes the construction of a single storey building housing an ESB substation and switch room located adjacent to a reconfigured stair and lift core for the decked car park; a single storey plant room; and reconfiguration of car parking spaces (to include provision of 8 no. additional disabled spaces and reduction of 65 no. spaces), and landscaping to facilitate relocated main lift and stair core. Ancillary landscaping and reconfigured car parking layout at ground and upper floor level of the decked car park is also included, alongside all associated infrastructure works, all relating to a permitted hotel under planning Reg. Ref. F08A/1305 (ABP Ref: PL06F.232704), as amended under Reg. Ref. F17A/0748.

Granted0.2 km13 January 2020

The full report covers all 5,028 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required