The development will consist of the provision of
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
ESB Belcamp 220 kV Substation, in the townlands of Clonshaugh and Belc
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
9% of nearby decided applications were refused. The preview found 5,129 nearby planning records within 5 km where a location match is available.
- Matched source
- F23A/0040
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Mayne Stability Limited intends to apply for permission for a period of 10 years development of a Synchronous Compensator Development (Grid Stabilisation Facility) on the site of c. 1.65 ha at lands south of Belcamp 220kV Substation, Belcamp, Dublin 17. The proposed development will consist of the following elements within the administrative boundary of Fingal County Council: a) A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; b) A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; c) A 220kV underground cable to the existing adjoining Eirgrid substation boundary; d) Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A concurrent planning application is being made to Dublin City Council which relates to a portion of lands to the south of the site of c. 0.94 ha which provides for a new access entrance from the R139 and a clear span bridge crossing over the River Mayne, internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours. AI received 3/8/2022
Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation, Belcamp Dublin 17. The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours.
RETENTION: The retention of the existing scrolling internally illuminated double sided ‘Metropole’ advertising display case mounted on an offset leg.
Planning permission for the installation of
The development will consist of the undergrounding a section of the Grange-Collinstown 38kV overhead line. The proposed alteration will comprise the installation of 2 no. lattice steel towers of maximum height of 13.2m. The section of existing overhead line to be removed, consists of 3 no. overhead conductors and 3 no. existing wooden pole sets. The associated overheard wires will be removed as part of the alteration. AI Rcvd 11/3/25
The full report covers all 5,129 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record F23A/0040The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report