Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Dublin Airport, Swords, Co. Dublin

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

11% of nearby decided applications were refused. The preview found 3,019 nearby planning records within 5 km where a location match is available.

Matched source
F23A/0636
Project type
One-off house
Coverage
5 km radius
3,019Nearby applications
11%Refused
2,678Conditional grants
11Refusal reasons

Top refusal reasons nearby

Design3
Other2
Residential Amenity2
Traffic Sightlines2
Premature Services1

Nearest similar decisions

F23A/0636

In the townlands of Pickardstown, Coultry, Huntsown, Forrest Great, Forrest Little, and Collinstown; and to the east of the airfield in the townlands of Cloghran, Corballis, Commons, Toberbunny, Stockhole and Clonshagh. The proposed development includes upgrades to existing drainage infrastructure and construction of additional drainage infrastructure to improve performance of the surface water management system at Dublin Airport and will consist of: a. a contamination detection and response (CD&R) system comprising detection devices, network decision points (DPs), control kiosks, and ancillary infrastructure including local access roads, local drainage and communications and power ducts; b. clean water supply pipelines consisting of large diameter trunk pipelines; c. airfield contaminated pipelines consisting of large diameter trunk pipelines; d. upgrades to the West Apron surface water collection network including reconfiguration of the existing network, construction of an underground attenuation tank, installation of a local CD&R system, network DPs and a control kiosks, construction of an underground pollution storage tank, a pumping station, and ancillary development including local ductwork, local access roads and local drainage; e. upgrades to the existing surface water collection network in the vicinity of the South Apron including reconfiguration of the existing network, construction of network DPs, upgrade of the existing flow diversion structure (FDS) and reconfiguration of the existing Cuckoo supply channel; f. a central pollution control facility (CPCF) consisting of underground pollution control storage tanks, a pumping station, a discharge pipeline to the Uisce Eireann network, mechanical and electrical equipment, a control building, an electrical substation, and ancillary development including a local access road, enhanced flood bund, local drainage and ducting; g. a CPCF pipeline consisting of a large diameter trunk pipeline; h. a central supervisory control and data acquisition (SCADA) system comprising kiosks and associated electrical power and signal connections; i. repurposing of the central section of the existing Airfield Trunk Culvert (ATC) as a contaminated pipeline; and j. ancillary and associated development including pipework, mechanical and electrical service connections and upgrades, temporary compounds and site works. This planning application is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement. AI received 13/06/24 SAI received 27/06/24

Granted0.0 km21 August 2024
F25A/0404E

The development will consist of the installation of new lightweight advertising display frames on both sides of the 27 airbridges located on the airside apron at both Piers 3 and 4 at Dublin Airport, including the removal of the existing displays, the installation of new displays and all associated site works.

Granted0.4 km27 June 2025
F23A/0104

Daa plc intend to seek planning permission for development

Granted0.5 km28 April 2023
F20A/0553

The development will consist of the installation of a new facade and thermal envelope to all elevations of the upper two storeys of the original Terminal 1 building (i.e. 'Levels 40 & 50'), with enhanced and consolidated daa office space to be provided accross both levels, and associated development at roof level and Level 10 (i.e. Arrivals Level). The development will include: Removal of the existing vertical concrete fins from all elevations of the building; Extension of the existing floorspace at Levels 40 & 50 to include external balcony areas; Strip out and refurbishment of the existing office floorspace at Level 40; The conversion of existing car parking to office floorspace at Level 40; The creation of an enlarged roof skylight requiring a new opening through the existing roof slab, along with a new opening through the Level 50 floor slab to create a double-height internal light well; The creation of a consolidated plant enclosure at roof level; The relocation of existing roof level plant to the consolidated plant enclosure, and the removal of redundant plant as required; The relocation of existing telecommunications antennae at roof level; bicycle storage area for staff at level 10 (at the base of existing spiral); Reconfiguration of internal floorspace at Level 10 to create staff lobby area; and all ancillary development, demolition, site works and services.

Granted0.5 km01 April 2021
F19A/0168

An extension of the existing Terminal 1 baggage hall in two locations

Granted0.5 km10 June 2019
F19A/0049

Development at a site at the Immigration Hall serving Pier 1 and Pier

Granted0.5 km07 June 2019

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required