The development will consist of the installation of new lightweight advertising display frames on both sides of the 27 airbridges located on the airside apron at both Piers 3 and 4 at Dublin Airport, including the removal of the existing displays, the installation of new displays and all associated site works.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Piers 3 & 4 Airbridges, Airside Apron, Dublin Airport, Collinstown, Co
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 3,222 nearby planning records within 5 km where a location match is available.
- Matched source
- F25A/0404E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
A covered pedestrian walkway for a distance of 80m, on the south-easte
The development will consist of enabling works to facilitate the manda
An extension of the existing Terminal 1 baggage hall in two locations
Planning Permission is sought for the demolition of the 2no. concrete spiral ramps which provide vehicular access to the Level 40 carpark & Level 50 external delivery bay, and all associated ancillary works, at Terminal 1, Dublin Airport, Collinstown, Co. Dublin. The existing vehicular access to Level 40 and Level 50 will no longer be required on foot of the development permitted under application register reference F20A/0553. The proposed development will also include a modification to the architectural treatment of the eastern façade of Terminal 1, as permitted under application register reference F20A/0553.
The development will consist of the installation of a new facade and thermal envelope to all elevations of the upper two storeys of the original Terminal 1 building (i.e. 'Levels 40 & 50'), with enhanced and consolidated daa office space to be provided accross both levels, and associated development at roof level and Level 10 (i.e. Arrivals Level). The development will include: Removal of the existing vertical concrete fins from all elevations of the building; Extension of the existing floorspace at Levels 40 & 50 to include external balcony areas; Strip out and refurbishment of the existing office floorspace at Level 40; The conversion of existing car parking to office floorspace at Level 40; The creation of an enlarged roof skylight requiring a new opening through the existing roof slab, along with a new opening through the Level 50 floor slab to create a double-height internal light well; The creation of a consolidated plant enclosure at roof level; The relocation of existing roof level plant to the consolidated plant enclosure, and the removal of redundant plant as required; The relocation of existing telecommunications antennae at roof level; bicycle storage area for staff at level 10 (at the base of existing spiral); Reconfiguration of internal floorspace at Level 10 to create staff lobby area; and all ancillary development, demolition, site works and services.
Source match
Matched from public planning record F25A/0404EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.