The construction of 4 no. light industrial units with ancillary office
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site C1, Millennium Business Park, Cappagh Road, Finglas, Dublin 11.
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 3,217 nearby planning records within 5 km where a location match is available.
- Matched source
- FW18A/0194
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Demolition of internal fixtures and fittings of ancillary offices to U
Construction of a high bay warehouse/storage facility to the north of 7B for use as 'Goods Outward' building, all ancillary to the use of the existing buildings and activities on site.
The proposed development will consist of (i) Change of use of existing cafe to new use as Window Shading Training Academy (ii) Minor amendments to the internal layout (iii) New cladding to external elevations with new signage (iv) and all associated ancillary and site works. AI Rcvd 07/11/2024
(i) Retention permission is sought for an existing storage yard (3,456 sq.m); Permission is sought for the provision of a temporary (5 year) storage yard comprising 3345 sq.m. The proposed storage yard will accommodate storage requirements arising from a national services and works contract with Gas Networks Ireland. Use of the storage yard will be ceased following the completion of the project in five years. The existing palisade fencing will be removed and replaces with an extended screening security mesh fencing. A verge of landscaping will be provided between the existing footpath and the proposed fencing. Works to provide the storage yard comprise of (a) stripping topsoil and excavating of in-situ material for the existing landscaped area and placement of imported gravel material pavement layers and wearing course; and (b) provision of a new private vehicular entrance to the yard. (iii) The proposed development includes all associated site development ancillary works necessary to facilitate the development including new dropped kerbs and pedestrian footpath at the proposed yard entrance and a land drain around the perimeter. Internal road works include road markings and traffic signage.
The development will consist of the installation of a substation building comprising of an ESB supply room and 1 no. switch room (c. 46 sq.m) within a planning application area of c 0.0046 Ha.
Source match
Matched from public planning record FW18A/0194The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report