Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

Ballycoolin Business Park, Ballycoolin Road, Dublin 15

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

12% of nearby decided applications were refused. The preview found 3,463 nearby planning records within 5 km where a location match is available.

Matched source
FW21A/0009
Project type
One-off house
Coverage
5 km radius
3,463Nearby applications
12%Refused
3,033Conditional grants
4Refusal reasons

Top refusal reasons nearby

Other2
Design1
Visual Amenity1

Nearest similar decisions

FW21A/0009

Permission for provision of an additional single storey modular switchgear building within the substation compound with a gross floor area of c. 46 sq.m.; Provision of 2 no. additional electrical transformers along with associated firewalls and lightning protection masts; Extension of the existing substation compound to accommodate the new transformers and switchgear building; Realignment of the existing access road to the south to enable the extension of the substation compound; and All associated and ancillary works, including boundary treatments, access arrangements, and services. The site takes in part of an existing substation compound permitted under Reg. Ref. FW16A/0159 as modified by Reg. REf. FW17a/0103 and an adjoining private access road. The site is bound to the west by an existing data storage facility, and to the northeast and southeast by exiting estate roads.

Granted0.0 km22 March 2021
FW25A/0431E

The development will consist of the following A) Replacement of existing external branding signage, and B) New external branding signage. This will include the replacement of existing wall mounted signage, the replacement of existing totem and monolith signage along the site boundary, and the erection of branded flags on existing flag poles.

Granted0.2 km17 November 2025
FW18A/0064

Erection of a totem sign at the entrance to Ballycoolin Business & Tec

Granted0.3 km14 January 2019
FW20A/0109

Permission for amendments to previously approved Grant of Permission ( Reg. FW19A/0147) at Keppel, Unit B10 IDA Business Park, Ballycoolin, Dublin 15 YN9K. The development consists of: a) a 59 sq.m extension to data hall within partial volume of previously approved external compound to provide for new loading bay to the western section of the compound, b) associated external roller shutter door and external sheltered levelling dock, c) minor changes to the compound elevations as a result of aforementioned amendments, and d) Relocation of proposed storm water swale from east side of proposed compound to west of the proposed compound. No additional generators or air handling units are proposed as part of the application.

Granted0.3 km03 September 2020
FW20A/0119

For amendedments to previously approved Grant of Permission (Reg Ref FW19A/0147 ) at Keppel Unit B10 Business Park, Ballycoolin Dublin 15 YN9K. The development consists of the enlargement of external mechanical compound to the Eastern elevation to accomodate reconfiguaration of previously approved mechanical plant and minor changes to the compound elevations as a result of aforementioned amendments. No additional generators or air handling units are proposed as part pf this application.

Granted0.3 km17 September 2020
FW19A/0147

Provision of a generator and air handling unit compound including 4 no. stainless steel flues, all to the south-east corner (rear and side of existing building), and provision of 218 sq.m. internal mezzanine plant area within the existing structure, all required to proivde critical technical support to Data Hall 3. Additional Information Lodged on 5th Dec 2019

Granted0.3 km09 January 2020

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required