Permission for the construction of 4 n o. industrial units consisting of offices, workshops and accessories, a training unit and storage, welfare facilities, parking for cars and HGV, stormwater retention pond, signage, site fencing, gates lights and all associated works. AI received 31/3/2022
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Site 11, Stadium Business Park, Ballycoolin Road, Dublin 11
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 3,720 nearby planning records within 5 km where a location match is available.
- Matched source
- FW21A/0190
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Construction of a warehouse building (ground floor 540m2 and first floor 172 m2) comprising offices, welfare facilities, workshop, storage areas, parking, storm water retention pond, facility lighting, building signage and all other associated site ancillary and infrastructure works required to make the building operational. AI received 06Oct 2022
Install 10KW of roof mounted solar panels on our unit (area of solar panels 47.7 sq.m. roof area 104.9 sq.m.) and all associate site works,
Retention of restoration and alterations to a dwelling house. The extensions to a dwelling house. Permission for a new front boundary wall and associated site development works.
For a development comprising: (i) construction of 5 no. industrial / warehouse / logistics units contained within 3 no. blocks consisting of: (a) Block A, containing Unit 1 and Unit 2, warehousing / distribution / logistics units comprising 2,011.m each; (b) Block B, containing Unit 3 and 4, industrial / warehousing units comprising 1,381sq.m each; and Block C, containing Unit 5, a warehousing / distribution / logistics unit comprising 1,635sq.m. Each unit will be provided with ancillary office space and staff facilities; (ii) Creation of vehicular access point to the west of the site to provide for public access, repositioning of 2no. existing vehicular access points & the provision of 1 no. new vehicular access point, all 3no. access points to the north for servicing and deliveries; (iii) 135 no. car parking spaces (including 6 no. EV spaces and 5 no. reduced mobility spaces) and 80 no. bicycle parking spaces will serve the development; and (iv) The development will also include all associated SuDS drainage, landscaping, boundary treatments, lighting, CCTV, signage and site development works necessary to facilitate the development.
Stadium Business Park Investment Limited intends to apply for permission for development comprising amendments to a previously permitted development (FCC Reg. Ref. FW22A/0061) at this site, Site Nos. 12 and 13 (containing Unit Nos. 1, 2, 3, 4, and 5), Stadium Business Park, Ballycoolin Road, Dublin 11. The proposed development will consist of: minor internal amendments, alterations to elevations, and provision of PV solar panels at roof level of all 5 no. units; the removal of Automatic Opening Vents (AOVs) at Unit No. 5; provision of new pedestrian and cycle access from Ballycoolin Road; the provision of an ESB substation and switch room to the west of Unit No. 1; minor site layout changes including the part relocation of permitted car and cycle parking, and provision of new motorcycle parking, all within the southern portion of the site; hard and soft landscaping; boundary treatments; cabling and ducting; and all associated site development works above and below ground.
The full report covers all 3,720 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
Source match
Matched from public planning record FW21A/0190The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report