Free preview / €49 incl. VAT full PDF

Planning precedent report

Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.
See sample PDF
Opens secure checkout for the €49 incl. VAT full PDF report.Have a code? Enter it at checkout.
€49 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelPlanning precedent preview

Planning precedent report

88 Hollystown Park, Hollystown, Dublin 15

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

14% of nearby decided applications were refused. The preview found 1,451 nearby planning records within 5 km where a location match is available.

Matched source
FW24A/0366E
Project type
One-off house
Coverage
5 km radius
1,451Nearby applications
14%Refused
1,251Conditional grants
1Refusal reasons

Top refusal reasons nearby

Design1

Nearest similar decisions

FW24A/0366E

Retention of a single storey garage and playroom (c. 50.7m.sq.) along with covered seating area and all other ancillary site development works to the rear of the existing dwelling.

Granted0.0 km21 October 2024
FW18A/0023

A single storey extension to rear to provide additional accessible gro

Granted0.3 km03 April 2018
FW23A/0107

Planning Permission for a) single storey extension to front porch b) single storey extension to the side and rear c) modifications to fenestration d) external wall insulation to all external walls with external render finish e) 2no. rooflights to flat roof of new extension f) and all associated site works

Granted0.3 km01 June 2023
FW25A/0344E

The development will consist of the retention of the existing domestic garage in the rear garden & its change of use to a self-contained one bed/kitchen unit with all. associated site development works.

Refused0.3 km07 October 2025
LRD0024/S3

1. The construction of 580 no. residential units consisting of 468 no. houses and 112 no. apartment and duplex units, ranging from 1 to 3 no. storeys set out as follows: * 468 no. houses consisting of 232 no. 2-bed units, 186 no. 3-bed units and 50 no. 4-bed units * 112 no. apartments and duplexes consisting of 104 no. 1-bed units and 8 no. 3-bed units 2. A total of 892. car parking spaces will be provided for this scheme comprising 824 no. resident parking spaces and 68. visitor parking spaces and 2,234 no. cycle parking spaces will be provided for this scheme comprising 2,174 no. resident cycle parking spaces and 60 no. visitor cycle parking spaces 3. A total c.2.25ha Class 2 Open Space comprising 15% of the total developed area including pocket parks (including both formal and informal play area), fitness areas, sitting areas, kick-about and ecological regeneration areas. In addition, c. 1.86ha of linear park to the north located under existing ESB powerlines provides a linear open space connection to Sites 2&3 (as permitted under ABP Reg. Ref. 312271), Site 1 (as permitted under FCC Reg. Ref. FW21A/0042 and under construction) and to permitted Dublin GAA facility (FCC Reg. Ref. FW22A/00198). A further 2.41ha of open space is provided within the scheme comprising open space areas, drainage and hedgerow corridors that can not be considered Class 2 Open Space but provide ample open space areas 4. A total c. 2.55 ha of Open space is provided in c. 3.5HA park permitted under Hollystown Site 1 (FCC Reg. Ref. FW21a/0042) 5. A new pedestrian and cyclist facilities, future potential connections to lands to the west and proposed connections to Tyrrelstown Park as agreed with Fingal County Council. Principal vehicular access to the application site provided by the new road extension to 'The Avenue', and internal road network of Sites 2&3 to the east (as permitted under ABP Reg. Ref. 312271. The Application also provides vehicular access to the future potential school site to the south if required as indicated in Fingal Development Plan 2023-2029. 6. The proposed scheme is designed to integrate with recently constructed development at Bellingsmore (FCC Reg. Ref. FW13A/0088/E1), under construction development on Site 1 (FCC Reg. Ref. FW21a/0042) and permitted Strategic Housing Development on Sites 2&3 (permitted under ABP Reg. Ref. 312271) and completes the last phase of the Hollystown-Kilmartin lands in accordance with the Kilmartin Local Area Plan 2023 (now expired). An Environmental Impact Assessment Report has been prepared in respect of the proposed development.

Granted0.3 km24 October 2023
FW26A/0137E

Planning permission for the construction of a single-storey rear extension to include a dining room extension and family flat.

Refused0.4 km19 May 2026

The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.

Policy and design risk

Full PDF

Source document extracts

Full PDF

Comparable decision table

Full PDF

Submission strategy

Full PDF
Ready to generate the full report?€49 incl. VAT once-off PDF, no account required