Construction and operation of an aggregate processing plant to produce construction-grade sand and gravel from quarry fines / screenings generated by extraction activities at the surrounding quarry complex (previously approved under Planning Ref. FW12A/0022). AI Rcvd 20/1/2025
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Huntstown Townland, North Road, Finglas, Dublin 11, D11A337
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
12% of nearby decided applications were refused. The preview found 2,653 nearby planning records within 5 km where a location match is available.
- Matched source
- FW24A/0372E
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
Extraction with associated crushing, screening and processing of rock
The proposed development will consist of an extension to the existing access road as previously permitted under Reg. Ref. FW19A/0226. Provision is also made for a roundabout junction at the eastern end of the new road. The planning application area is c. 1.8 hectares. The development includes for pedestrian footpath and cycle-path links from the existing road; provision of all associated trunk utility services shall be provided to serve the adjacent development lands to include surface water drainage infrastructure, foul water drainage infrastructure, watermains, public lighting and associated ancillary works. The proposed development also includes for a single storey security booth (c.22.9m² and a max height of 3.6m); associated security barriers; and 4 no. parking spaces (1 no. being a disabled parking bay). This infrastructure may be removed prior to or upon the road being taking in charge by Fingal County Council. The new section of the road will provide access to existing lands zoned as Heavy Industry (HI) in the current Fingal County Development Plan 2017-2023. The H1 zoned lands which the new access road will service, will be the subject of separate planning applications for development(s) at future dates.
Proposed development will consist of an extension to the site access road off the existing roundabout aqt the jct of the Kilshane Rd (L3120) & Cappagh Rd (L3080) as previously permitted under P. Ref. FW17A/0152. The new section of road will provide access to service the existing lands zoned as Heavy Industry. Provision of piers, access gates and signage.
The proposed development, within the previously permitted application areas of planning ref's FW17A/0152 and FW19A/0226, will consist of temporary security controls adjacent to the Kilshane Road (L3120) and Cappagh Road (L3080) roundabout junction at the entrance to Huntstown Estate. The development within an application area of c.0.08 hectares includes for 6 no. retractable electric security bollards within the road carriageway; 8 no. demountable bollards between the footpaths/cycle-paths/grass verges; and 1 no. set of temporary automatic security gates (height c. 2.4m) located within the road carriageway.
The construction of a single storey waste recovery/transfer building w
Source match
Matched from public planning record FW24A/0372EThe full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report