Planning Permission for the installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 and 2025 shall apply.
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Unit 8, Cedar Drive, Coldwinters & Newtown, Dublin Airport Logistics P
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
11% of nearby decided applications were refused. The preview found 2,240 nearby planning records within 5 km where a location match is available.
- Matched source
- FW26A/0050E/R3
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
Open preview
Nearest similar decisions
The construction of an open mezzanine floor, 596 m2 in area for storage use, with access from the existing ground floor level of the warehouse, and associated works.
Permission is sought to construct a two-story static simulator building with ancillary briefing rooms and store to the rear of the existing building. Additional Information Received 17/12/2025
The construction of a single storey unit for industrial and/or warehou
The development consists of the material change of use from warehouse space to (a) a single storey climate controlled room (2,493m2), clean room (60m2) and office (42m2) to the warehouse area, cold store rooms to the mezzanine undercroft (187m2) comprising total gross floor area of 2,782m2, (b) two large tanks, one containing water servicing the sprinkler system (8.462m high/9.3m diameter) and one containing liquid nitrogen (8.15m high/3.57m diameter) and associated sprinkler pump room (35m2) to the rear service yard area and (c) all associated site works. AI Received 24th September 2025 Significant Additional information Received 14/10/2025
The construction of a standard two room electrical substation to the r
The full report covers all 2,240 decisions within 5km — with the planner's exact reasons, verbatim quotes and policy citations — delivered as a PDF. €49 incl. VAT.
The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.