Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 713 decisions within 5 km, 1 exact-site or onsite candidate record, and 48 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
48 structured nearby appeal records.
48 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 10 Year planning permission for a solar farm with a total area of circa 73 hectares in the townlands of Ballybar Lower, Ballybar Upper, Ballycarney, Ballyloo, Linkardstown, Park and Tinryland in County Carlow. The solar farm will consist of solar panels on ground mounted frames, 11 no. single storey electrical inverter/transformer stations, 3 no. single storey spare parts containers, 2 no. Ring Main Units, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L1010, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 3 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and L3050), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. entrances from the L1022 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farm proposed under Carlow County Council Reference 24/60043, but will not alter infrastructure proposed under that application. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
Permission to retain the demolition of a garage, a new garage and the relocation of the entrance and all associated site works
A 10 Year Planning Permission for a solar farm with a total area of circa 57 hectares. The solar farm will consist of solar panels on ground mounted frames, 8 no. single storey electrical inverter/transformer stations, 2 no. single storey spare parts containers, 1 no. Ring Main Unit, 3 no. weather stations, underground electrical ducting and cabling within the development site, private lands and within the L4038, L8185, R448, L3051, L3052 and L3050 public roads to connect solar farm field parcels, security fencing, CCTV, access tracks, 5 no. watercourse/drain deck crossings and 2 no. horizontal directional drill crossings (under M9 motorway and the Dublin - Waterford railway), temporary construction compounds, landscaping and all associated ancillary development and drainage works. Construction and operational access will be via 2 no. existing entrances from the R448 and L1010. Sections of the proposed underground electrical cabling will traverse the solar farms proposed under Carlow County Council References 24/60043 and 24/60205, but will not alter infrastructure proposed under these applications. The operational lifespan of the solar farm will be 40 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
To demolish existing single storey dwelling and remove existing septic tank and shed, and construct a replacement single storey dwelling, revisions to existing entrance, new waste treatment system and percolation area, use of on-site mains water and all associated site works
Retention permission is sought for the as built detached domestic garage to the rear of existing dwelling and all associated site development works
The retention and completion of the importation of soil for the purposes of land improvements at Park, Tinryland, Co. Carlow
The brief summarizes the pattern across all 713 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2460205The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief