Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 148 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Amend the design of the approved development (Planning Ref: 19/600239) which comprises consent for the development of a temporary (30 years) solar farm with an export capacity of 12 MW comprising of photovoltaic panels on ground mounted frames with associated infrastructure including 4 no. inverter housing cabins, 1 no. control building, 1 no. customer cabin (substation), 1 no. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks subject to 16 conditions. Amendments proposed are: - - Although the height of the solar panels is increased from 2.7m to a maximum 3.2m, the glint and glare impacts will reduce due to advancements in the assessment and software used. The panel tilt angle will change from between 15 and 25 degrees to 15 and 30 degrees; - The number of solar modules will reduce from 39,168 to 30,060 and the number of pile driven poles installed will increase from 2,548 to 4,258; - Although there will be an increase in the number of Inverter Substations from 4 to 6, these have a lower noise output and will therefore result in lower noise impacts; - An increase in CCTV cameras along the perimeter fence from 8 to 12; - Although the road will remain at a width of 3.5m, the point where it connects from the southern to northern lands is moved to use the existing access; - An almost identical footprint which will increase by 0.03% to 4.08%; and – Increase the output from 12MW to 16MW
A 10 year permission. The development will consist of a solar farm with an export capacity of 12 MW compositing of photovoltaic panels on ground mounted frames with associated infrastructure including 4 No. Inverter Housing cabins, 1 No. control building, 1 No. customer cabin (substation), 1 No. DNO substation, temporary construction compound, ducting and electrical cabling, perimeter agricultural fencing, mounted CCTV cameras and internal access tracks. The planning application will be accompanied by a Natura Impact Statement
The construction of a new dormer dwelling and to renovate and make minor alterations to the the existing derelict dwelling, which will be integrated into the new dwelling; installation of a new domestic wastewater treatment system and all associated works
The construction of new single storey dwelling, proposed waste-water treatment system and percolation area, external garage, new site entrance including gate and piers and modifications to hedgerow and All necessary associated site works and services
The following; 1) rear and side extension to my dwelling and 2) 3no. storage sheds and all associated site development works
Construction of 1) a new storey and half dwelling 2) new domestic garage 3, new site entrance, driveway and modification to hedgerow 4) waste water treatment system and all associated site works
The brief summarizes the pattern across all 148 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief