Erect 14,500.77 m2 of photovoltaic panels on a ground mounted system with all associates site works at Servier (Ireland) Industries Limited. The development will comprise of a 2.0 MWp Solar PV farm on 3.36 hectares of land located to the south of our existing pharmaceutical manufacturing plant. The electricity generated will be used by Servier (Ireland) Industries Limited. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; 1 no. spare parts cabin; using all temporary ways and temporary construction compound / set-down area included on the application
Planning precedent report
Search a place or planning reference, choose the development type, then preview the report before generating the full PDF.Planning precedent report
Gorey Road , Arklow , Co. Wicklow
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
13% of nearby decided applications were refused. The preview found 534 nearby planning records within 5 km where a location match is available.
- Matched source
- 2360167
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest similar decisions
Proposed development, for which a ten-year permission is sought, consists of the following: Demolition of existing outbuildings on the subject site, along with all site clearance and enabling works; Construction of 3 no. part one storey, part two storey, information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of C. 22,210 sq. m (66,630 sq. m GAF in total), and with a height (to parapet level) of c. 10.4 metres; Each of the 3 no. ICT facility buildings will accommodate ICT equipment rooms, associated electrical and mechanical equipment rooms, loading bays, maintenance and storage space, office administration areas, and staff facilities; Emergency generators (20 no. for each ICT facility building), flue stacks and associated plant are provided in fenced compounds adjacent to each ICT facility; Extension of the existing road serving Kish Business Park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway on its eastern side. The proposed roadway will form part of the inner relief road planned under Objective IT7 of the Arklow Town and Environs LAP 2018-2024; Construction of internal road network and circulation areas, footpaths, provision of 180 no. car parking spaces (60 no. spaces to serve each ICT facility) and 18 no. cycle parking spaces; Landscaping and planting, boundary treatments, lighting, security fencing, gatehouse (with a GFA of 175 sq. m), and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cables, on an application site area measuring c. 24.16 hectares. Site located to the North & Northeast of the existing Kish Business Park
1) construction of a single storey extension to existing office building. 2) construction of a single storey extension to existing production building and 3) all associated and ancillary works, including reconfiguration of existing external steps and footpaths and connections to existing surface water collection network, all at existing facility
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development works
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Source match
Matched from public planning record 2360167The full report adds the full list of similar grants and refusals, source quotes, document links, and a shareable PDF summary.
Included in full report
Policy and design risk
Included in full report
Source document extracts
Included in full report
Comparable decision table
Included in full report